Laserfiche WebLink
Mr. Tom Horton <br /> March- 25, 1988 Project 939-03.'13 <br /> Page 4• <br /> depth, casing size, and construction details) will be obtained and <br /> presented. A map showing the current land use within a 1-mile radius <br /> of the site will also be constructed, according to Section 2595(h) (4) <br /> of Subchapter 15. Present and anticipated future use of ground water <br /> within 1 mile of the perimeter of the site will also be described, <br /> according to Section 2595(h) (5) of Subchapter 15. <br /> Subtask 6-6 - Evaluation of Surface-Water and Ground-Water Sampling <br /> and Analysis <br /> The results of the surface-water and ground-water analyses will be <br /> evaluated to determine the chemical character of water at and downgra- <br /> dient of the site to indicate whether the landfill has had an impact <br /> on water quality. <br /> Subtask 6-7 - Evaluation of Unsaturated Zone Sampling and Analysis <br /> The chemical characterization of the soil -pore liquid in the unsatu- <br /> rated zone will be evaluated to determine if the landfill is leaking. <br /> Subtask 6-8 - Air Quality SWAT <br /> A summary of the findings of the Air Quality SWAT will be presented. <br /> BUDGET <br /> The cost estimate for performing the tasks on a lump-sum basis is <br /> attached. We suggest that the existing agreement between the County <br /> of San Joaquin and EMCON be used to cover these additional services. <br /> SCHEDULE <br /> EMCON is prepared to initiate the scope of work described above within <br /> 1 week of receiving your authorization to proceed. To meet the <br /> July 1 , 1988 deadline for submittal of a SWAT report, we have tenta- <br /> tively scheduled drilling to begin on April 4, 1988. <br /> gg'�1 � y <br />