Laserfiche WebLink
SITE IMPROVEMENT PLAN <br /> DRAINAGE REQUIREMENTS <br /> New development shall provide for all of the storm water runoff that is generated. The use of roadside <br /> ditches or gutters are not allowed. <br /> All existing development shall provide for the additional storm water runoff that is generated in accordance <br /> with current design standards. <br /> G The Improvement Plan shall show the location of existing and proposed storm drainage facilities (check <br /> u with Engineering staff regarding design criteria). If subject to flooding, the 100-year flood elevations must <br /> be shown. Indicate any unusual topographic features of the site (e. g, contours, steep slopes, or drainage <br /> courses). <br /> • All developments shall provide terminal drainage where the development is within close proximity(see <br /> chapter 9-1135 of the County Development Title) to terminal drainage facilities. "Terminal drainage" <br /> means a storm drainage system which by gravity carries storm water ultimately to the ocean. <br /> x- <br /> tµ• When terminal drainage is not readily available, storm drainage/additional run-off shall be retained on-site, <br /> and provisions shall be shown on the Improvement Plan. <br /> �y Retention ponds are drainage ponds with no outlet facilities for terminal drainage. They must be designed <br /> to be capable of storing the required volume and of emptying through percolation and evaporation over a <br /> k specified time. If applicable, pond capacity calculations shall be submitted for approval (see attached <br /> calculation form for retention ponds). <br /> If retention ponds are to be used in combination with other uses in addition to storm water runoff(e.g. dairy <br /> farms), then calculations shall be provided to show that the ponds are sufficiently sized for both uses <br /> (Refer to handout entitled "Drainage Requirements- Dairy Farms"). <br /> r=' <br /> 9 <br /> r <br /> R <br /> i^ <br /> ry ': <br /> e <br /> T <br /> M MEVSMI'll ping Application rorms0n,Improvement Plan. Page 5 of g <br /> eVised 5-11-09) <br />