Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
ATTACH M ENT A <br /> Materials Company <br /> WEST REGION <br /> Valley Rock Asphalt Plant <br /> Temporary Corporation Yard <br /> Improvement Plan <br /> Project Description <br /> Vulcan maintains that we are allowed to install an asphalt plant under our current permits, however we <br /> understand that engaging in this process to approve a "temporary corporation yard" at the site could <br /> lead to a prompt compromise on the issue. <br /> This improvement plan is to allow a temporary corporation yard for an Interstate 5 resurfacing project <br /> (Attachment B). A portable asphalt plant will be erected within the corporation yard where asphalt will <br /> be produced and trucks will enter the yard to accept loads.Approximately 340,000 tons of materials will <br /> be provided for the resurfacing project. Production of asphalt will last approximately 180 days (or until <br /> the job is complete) based on the proposed Caltrans schedule for the project (April 1st to November <br /> 1st), however the schedule may be adjusted based on CalTrans requirements. The majority of trucking <br /> and production of asphalt will occur predominately at night based on CalTrans lane closure schedule, <br /> however daytime operations are also necessary to prepare and maintain equipment and import <br /> necessary materials that are required to meet job specifications. <br />