Laserfiche WebLink
Evacuation Monitor. Once the evacuation announcement is made, the evacuation monitor: <br />• "Sweeps' the facility to ensure all employees have evacuated: Upstairs/downstairs offices <br />and fabrication shop work areas; <br />• Proceeds to the designated assembly area after "sweeps" completion. <br />Headcount Coordinator. The headcount coordinator is responsible for: <br />• Maintaining a current roster of facility employees and a Visitor Sign -In Sheet; <br />• Brings the roster and visitor sign -in sheet to the designated assembly area when the <br />evacuation announcement is made; <br />• Takes headcount of facility employees and visitors against the roster; <br />• Informs the EAP Administrator if any facility employees or visitors are missing; <br />• Documents bomb threats call via the checklist in Appendix A <br />■ Table II—Emergency Services Personnel Contact Information <br />Service <br />Contact <br />Address/Location <br />Telephone <br />Ambulance/EMS <br />9-1-1 <br />Police <br />9-1-1 <br />Fire <br />9-1-1 <br />Medical Facility <br />Poison Control Center <br />800-222-1222 <br />CAL -OSHA Area Office <br />Area Director <br />39141 Civic Center Dr., <br />Ste. 310 <br />Fremont, CA 94538 <br />510-794-2521 <br />idectric <br />PG&E <br />4040 N W Lane <br />Stockton, CA 95204 <br />209-942-1728 <br />Watcr <br />CA Water Service <br />Company <br />1505 E. Sonora Street <br />Stockton, CA 95205 <br />209-547-7900 <br />Gas <br />PG&E <br />3136 Boeing Way <br />Stockton, CA 95206 <br />209-955-7300 <br />Plan Review and Update <br />The EAP will be reviewed annually and updated whenever: <br />• New hazards are identified or existing hazards change; <br />• There are changes to the facility layout or infrastructure; <br />• Personnel designated in the EAP have terminated their employment. <br />2 <br />