My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
1550
>
1900 - Hazardous Materials Program
>
PR0524099
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2018 11:53:26 AM
Creation date
6/9/2018 1:10:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0524099
PE
1921
FACILITY_ID
FA0016190
FACILITY_NAME
APL LOGISITICS
STREET_NUMBER
1550
Direction
N
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25003018
CURRENT_STATUS
01
SITE_LOCATION
1550 N CHRISMAN RD
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\C\CHRISMAN\1550\PR0524099\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
1/6/2016 11:05:11 PM
QuestysRecordID
2915516
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLAN ACTIVATION <br /> Emergency Alert <br /> In the event that a situation or disaster occurs at APLL - Tracy, the Business <br /> Contingency Planning Team is responsible for contacting the Management Team <br /> and assessing the emergency situation. <br /> An alert will be sent to all Department Heads. Status updates will be provided by <br /> the Business Contingency Planning Team to the Department Heads for <br /> dissemination of pertinent information. <br /> Local Agencies will be contacted in the event of an emergency such as fire, <br /> earthquake, spill, etc. IN the event of a spill <br /> • Contact supervisor <br /> • Evacuate areas <br /> • Assess spill <br /> • Cover drains and and contain material with spill absorbent <br /> • Evacuate area, if necessary <br /> • Contact local agency or spill contractor if determined necessary <br /> Damage Assessment <br /> During the damage assessment phase, the Business Contingency Planning Team <br /> will identify specifically who and what has been affected by the disaster. The <br /> Business Contingency team will evaluate the event that has occurred and <br /> determine what department heads will be required to respond. <br /> The decision to activate the disaster recovery plan for the affected areas may be <br /> made at this point. <br /> As part of the damage assessment process, the risk assessment to the business <br /> will be evaluated. Considerations of engaging temporary facilities, equipment and <br /> vendors will be reviewed and a determination to enact recovery procedures will <br /> be determined by the Business Contingency Planning Team and Department <br /> Heads. <br /> If after assessment it is determined that activation of the recovery plan is <br /> required, notification to the Executive Team will be made. An authorized <br />
The URL can be used to link to this page
Your browser does not support the video tag.