My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1010
>
1900 - Hazardous Materials Program
>
PR0520328
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 3:55:10 PM
Creation date
6/10/2018 11:28:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0520328
PE
1921
FACILITY_ID
FA0010456
FACILITY_NAME
THATCHER COMPANY OF CALIFORNIA INC
STREET_NUMBER
1010
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17728053
CURRENT_STATUS
01
SITE_LOCATION
1010 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1010\PR0520328\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/2/2017 9:57:47 PM
QuestysRecordID
3716051
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazardous Materials Business Plan <br />Employee Training Plan <br />ENVIRONMENTAL <br />HEALTH DEPARTMENT <br />BUSINESS NAME <br />Sierra Chemical Co. <br />SITE ADDR I SS (' Ill ZIP CODE <br />1010 Industrial Drive Stockton 95206 <br />DATE CERS ID # <br />2/18/2016 10183569 <br />All facilities subject to the Hazardous Materials Business Plan (HMBP) Program must have a <br />training program and a written employee training plan for hazardous materials safety and <br />emergency response. The training plan is a required section of the HMBP which must be <br />submitted electronically as part of the complete HMBP submission. The training program <br />should be designed for the business size and type. Initial training is required for new employees <br />(e.g., within 30 days from date of hire) followed by annual refresher training. <br />To satisfy the HMBP training program elements, the program must, at a minimum, include: <br />• Hazardous materials handling and safety procedures <br />• Emergency response agency coordination procedures <br />• Appropriate use and maintenance of emergency response equipment and supplies <br />• Emergency response plans and procedures <br />• Procedures for immediate notification of local emergency response agencies, CUPA, Cal <br />EMA, and onsite emergency personnel <br />• Identification of local emergency medical assistance resources <br />• Hazard mitigation, prevention, and abatement procedures <br />• Facility notification and evacuation procedures <br />• Identification of facility areas, equipment, and systems vulnerable to earthquakes <br />Note: If your, facility generates hazardous waste, refer to the Consolidated Emergency <br />Response/Contingency Plan Section L Employee Training for additional details. <br />Personnel are trained in the following: <br />F■ Internal alarm and notification <br />❑■ Evacuation, assembly point locations, and re-entry <br />0■ Emergency incident reporting <br />7■ External emergency response organization/agency notification <br />7■ Location and content of Emergency Response/Contingency Plan <br />0■ Identification of local emergency medical assistance resources <br />FM102.11.1 Employee Training Plan Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.