My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1130
>
1900 - Hazardous Materials Program
>
PR0519894
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2019 9:46:17 AM
Creation date
6/10/2018 12:29:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0519894
PE
1921
FACILITY_ID
FA0003741
FACILITY_NAME
JIFFY LUBE #598
STREET_NUMBER
1130
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
15120405
CURRENT_STATUS
01
SITE_LOCATION
1130 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
EJimenez
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\1130\PR0519894\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
12/23/2015 12:49:16 AM
QuestysRecordID
2955105
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sep 23 15 07:30a Jiffylube598• 92398763 p.6 <br /> SPCC Overview <br /> A Spill Prevention Countermeasure and Control (SPCC) plan should be completed, <br /> implemented and maintained at each Jiffy Lube store with the following volumes of <br /> Petroleum Storage: <br /> • Combined aboveground storage capacity exceeding 1,320 gallons, or <br /> • Underground storage exceeding 42,000 gallons of capacity. <br /> The plan should address operating procedures the facility implements, control measures <br /> designed to prevent oil from reaching navigable waters, and countermeasures to <br /> contain, cleanup, and mitigate the effects of an oil spill that has an impact on the <br /> environment. Additional major elements of the SPCC Plan should include employee <br /> training, container inspections, secondary containment, and integrity testing. <br /> The plan should be recertified every five years or when there is a major revision to the <br /> store's oil storage capacity or secondary containment. Examples of major revisions <br /> include installation of additional containers/tanks, changing products of tanks, or moving <br /> container storage areas. <br /> Jiffy Lube International provides support and information to assist franchisees with <br /> SPCC compliance including SPCC Plan templates and instructions, regulatory <br /> advisories, list of professional engineers, and general guidance. To obtain additional <br /> information, contact Frank Perez at (713) 546-6604. <br /> FRANCHISEES SHOULD REVIEW THE SPCC LAWSIREGULATIONS. SPCC <br /> INFORMATION PROVIDED BY JIFFY INTERNATIONAL, INC. DOES NOT <br /> CONSTITUTE LEGAL ADVICE .AND THE FRANCHISEE IS STRONGLY <br /> ENCOURAGED TO SEEK THEIR OWN LEGAL COUNSEL. <br /> FOR YOUR CONVENIENCE, A COPY OF THE SPCC PLAN CAN BE INSERTED <br /> BEHIND THIS TRAINING OUTLINE FOR EASY ACCESS. <br /> RECEIVED <br /> SEP 2 3 2015 <br /> ENVIRONMENTAL. <br /> '�c n '+. ncpn OTAACAIT <br /> I <br /> JiFfy�ubE International,Inc.snakes no representations or worran6es as to the accuracy or applrtabNity of the information <br /> contained herein <br />
The URL can be used to link to this page
Your browser does not support the video tag.