<br />SUMMARY OF PROPOSED WORK:
<br />1. DRILL 300' WELLAND INSTALL 16 ANODES.
<br />2. INSTALL 40V/ 30A RECTIFIER, AIB, RMU, AND
<br />AC DISCONNECT ON ADJACENT POLE.
<br />3. CONNECT (2) N 6 AWG WIRES TO LINE 401 & 002,
<br />RUN CATHODE CABLES TO CATHODE JUNCTION BOX.
<br />4. RUN ANODE CABLES TO ANODE JUNCTION BOX.
<br />5. INSTALL 2 GROUND RODS.
<br />6. INSTALL CTS AT EACH PIPELINE.
<br />7. MAKE 2 It 8 CONNECTIONS DIRECTLY TO LINE 002 & 401.
<br />8. RUN THE CABLES INTO THE TUFF BOX BOND BOX.
<br />9. EXPOSE CRIMSON PIPELINE AND TRENCH TO BOND BOX.
<br />CRIMSON PERSONNEL WILL MAKE ALL CONNECTIONS TO
<br />CRIMSON PIPE AND RUN CABLES TO TUFF BOX.
<br />10. PG&E PERSONNEL WILL NOT MAKE ANY CONNECTIONS
<br />TO CRIMSON PIPELINE.
<br />SEQUENCE OF OPERATIONS:
<br />1. DRILL 300' WELL AND INSTALL 16 ANODES.
<br />2. INSTALL 40V / 30A RECTIFIER, AIB, RMU, AND
<br />AC DISCONNECT ON ADJACENT POLE.
<br />3. CONNECT (2) N 6 AWG WIRES TO LINE 401 & 002,
<br />RUN CATHODE CABLES TO RECTIFIER.
<br />4. RUN ANODE CABLES TO ANODE JUNCTION BOX.
<br />5. INSTALL 2 GROUND RODS.
<br />6. INSTALL CTS AT EACH PIPELINE.
<br />7. MAKE (2) N 8 AWG WIRE CONNECTIONS DIRECTLY
<br />TO LINE DD2 & 401.
<br />8. RUN CABLES INTO THE TUFFBOX BOND BOX,
<br />1
<br />2
<br />�I 3
<br />CONSTRUCTION NOTES:
<br />5 °I
<br />GENERAL REQUIREMENTS:
<br />1. UNDERGROUND SERVICE ALERT:
<br />CALL 811 (1-800-227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT INCLUDING INITIAL DAY OF
<br />CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, INCLUDING ALL
<br />NON -UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE.
<br />2, UTILITY NOTES:
<br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BESTAVAILABLE INFORMATION
<br />FROM SEVERALSOURCES, AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL
<br />PRIOR TO FABRICATION.
<br />B. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF
<br />UNDERGROUND UTILITIES, PROPERTY LINES, AND OTHER SUBSTRUCTURES IS NOT GUARANTEED
<br />TO BE ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTION PERSONNEL
<br />ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF
<br />UNDERGROUND UTILITIES AND OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR
<br />ENCROACHMENTS.
<br />C. PROSPECTING IS REQUIRED AHEAD OF WORK. ALL OFFSETS OR ROPING WILL NEED TO BE
<br />APPROVED BY THE PG&E PROJECT ENGINEER (PED), AND REDLINED DETAILS SHOWN ON PROFILE
<br />AND CONSTRUCTION DETAILSHEETS OF EACH ADDITIONAL SUBSTRUCTURE.
<br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT
<br />DIG METHODS (e.g. VACUUM EXCAVATIONS OR SIMILAR).
<br />3. ELBOWS AND FIELD BE14DS:
<br />A. ALL BENDS ARE SMOOTH FIELD BENDS, EXCEPT WHERE ELBOWS ARE SHOWN, FIELD BENDS
<br />SHALL BE MADE IN ACCORDANCE WITH A-36, SECTION 4D. FIELD BENDS MAY BE USED IN LIEU
<br />OF ELBOWS WHEN PREAPPROVED BY THE PG&E PROJECT ENGINEER (PED).
<br />B. IN ORDER TO AVOID EXCESSIVE STRAIN ON THE PIPELINE, THERE SHALL BE A MINIMUM
<br />SEPARATION OF 5 FEET BETWEEN A ROPED SECTION OF PIPELINE AND ANY ELBOWS OR FIELD
<br />BENDS.
<br />C. ALL ANGLES SHOWN IN THE PLAN AND PROFILE ARE APPROXIMATE AND SHALL BE CUT TO SUIT
<br />FIELD CONDITIONS.
<br />4. SEPARATION FROM OTHER STRUCTURES:
<br />A. CROSSING UNDERGROUND FACILITIES: PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST
<br />24 INCHES OF CLEARANCE FROM ANY OTHER SUBSTRUCTURE/UTILITY NOT ASSOCIATED WITH
<br />THE PIPELINE UNLESS NOTED ON THE DRAWINGS.
<br />B. PARALLELING UNDERGROUND FACILITIES: THIS PIPELINE MUST BE INSTALLED WITH AT LEAST
<br />5 FEET OF CLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED
<br />WITH THE PIPELINE UNLESS NOTED ON THE DRAWINGS.
<br />5. RESTORATION AND CLEAN UP:
<br />A. RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC. ABOVE PIPE BEDDING SHALL BE IN
<br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS.
<br />B. WHERE EVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12" AND
<br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED.
<br />TAKE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL.
<br />6. DESIGN NOTES:
<br />A.THIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS -BUILT DRAWINGS & RECORDS.
<br />ACCURACY IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE
<br />DRAWINGS.
<br />7. WELDING REQUIREMENTS:
<br />A. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL
<br />MANUALTD-4160M. ALL CANS OR SPOOLS SHALL BE A MINIMUM LENGTH OF ONE PIPE DIAMETER,
<br />WHENEVER POSSIBLE.
<br />B. INSTALL TEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D
<br />CORROSION CONTROL MANUAL 0-10, 0-10.1 AND 0-10.2.
<br />8. WELDING:
<br />WHEN INTERNAL MISALIGNMENT EXCEEDS 0.094", BACKWELD ANY GIRTH WELD WHERE THERE IS
<br />ACCESS TO THE INSIDE OF THE WELD. WHERE THERE IS NO ACCESS TO THE INSIDE OF THE WELD,
<br />MACHINE BORING OR GRINDING IS REQUIRED. BACKWELDING, GRINDING, OR BORING MUST BE
<br />DONE IN ACCORDANCE WITH THE APPROPRIATE UTILITY PROCEDURE IN THE GAS WELDING CONTROL
<br />MANUAL TD -4160M.
<br />9. STRENGTH TEST REQUIREMENTS
<br />A. STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD
<br />A-34 AND SHALL BE CONDUCTED IN ACCORDANCE WITH UTILITY PROCEDURE TD -4137S.
<br />B. ALL WELDS THAT HAVE NOT BEEN STRENGTH TESTED AND ALL FITTINGS SHALL BE SOAP TESTED AT
<br />100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR.
<br />10, PAINTING AND COATING REQUIREMENTS:
<br />A. ALL EXPOSED PIPE AND FITTINGS ARE TO BE PAINTED IN ACCORDANCE WITH GAS STANDARD
<br />E-30. ALL COATING ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH
<br />GAS STANDARD E-35.
<br />B. FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE.
<br />11. INSPECTION OF EXISTING PIPELINE:
<br />A. WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING
<br />CONSTRUCTION, FOLLOW TD-510OP-01 TO DOCUMENT PIPE INSPECTION. THIS APPLIES TO EXISTING
<br />AND TO BE RETIRED FACILITIES.
<br />B. EXISTING GIRTH WELDS, AT TIE-IN LOCATIONS, SHALL BE IDENTIFIED AND REMOVED IF PRACTICAL,
<br />C. PRIOR TO TIE-IN, INSPECT COATING AND PIPE FOR DEFECTS, IF DEFECTS ARE FOUND,
<br />CONTACT PED FOR GUIDANCE.
<br />12. TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH
<br />THE FOLLOWING WORK PROCEDURES:
<br />A. TD -4100-01, HOT AND COLD WORK METHODS FOR NATURAL GAS TRANSMISSION PIPELINE
<br />SHUTDOWN AND TIE-IN.
<br />B. TD -44415, GAS CLEARANCE PROCEDURES FOR FACILITIES OPERATING OVER 60 PSIG.
<br />WARNING:
<br />THIS DOCUMENT CONTAINS 0-k '
<br />CONFIDENTIAL, PROPRIETARY
<br />INFORMATION THAT IS THE SOLE
<br />PROPERTY OF PACIFIC GAS AND
<br />ELECTRIC COMPANY AND IS
<br />INTENDED FOR USE ONLY BY K '�
<br />AUTHORIZED PACIFIC GAS AND ©PGSE CO. cj, Rap£1 Cdi3D9'S �7®B�iJ. 1
<br />ELECTRIC COMPANY EMPLOYEES ° p
<br />AND ITS AGENTS, eJp � 6%YBP0 Noll dig. ND
<br />e1 3 I 4 5 0�
<br />C�
<br />0
<br />13. COATING REMOVAL:
<br />A. PERFORM THE FOLLOWING STEPS, IN ACCORDANCE WITH TD -4711P-01, BEFORE REMOVING
<br />ASPHALTIC PIPE WRAP ON PIPELINES INSTALLED PRIOR TO 1972 (BASED ON PG&E ANALYSIS,
<br />PIPE INSTALLED IN 1972 OR LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOS):
<br />1. REFER TO THE "EXISTING PIPE SPECS (PRE -1972)" STAMP TO DETERMINE IF A SAMPLE HAS
<br />BEEN COLLECTED OR IF A SAMPLE IS REQUIRED:
<br />a. "YES" REPRESENTS HISTORICAL RESULTS ARE AVAILABLE SHOWING THAT PIPE WRAP
<br />CONTAINS ASBESTOS. NO SAMPLE IS REQUIRED.
<br />b. "NO" REPRESENTS HISTORICAL RESULTS ARE AVAILABLE AND THE PIPE WRAP DOES NOT
<br />CONTAIN ASBESTOS (CONTENT WAS NON DETECT). NO SAMPLE IS REQUIRED.
<br />c. "UNKNOWN" REPRESENTS NO HISTORICAL RESULTS ARE AVAILABLE. A SAMPLE IS
<br />REQUIRED IF THE PIPE INSTALLATION DATE IS PRIOR TO 1972.
<br />2. WHEN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASBESTOS:
<br />a. COLLECT SAMPLE PER TD -4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM
<br />TD-4711P-01-FOl.
<br />b. FILE PINK COPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS
<br />WITH THE AS -BU I LTS.
<br />3. WHEN REMOVING PIPE WRAP THAT CONTAINS ASBESTOS, OR FOR EMERGENCY WORK,
<br />FOLLOW TD -4711P-01 "PIPE WRAP REMOVAL, HANDLING AND DISPOSAL".
<br />CATHODIC PROTECTION NOTES:
<br />1. FOLLOW TD-510OP-01 TO DOCUMENT INTERNAL CORROSION AND EXTERNAL CORROSION
<br />INSPECTION OFTHE PIPELINE.
<br />2. UPON COMPLETION OF BORINGS, CONTACT THE CORROSION SUPERVISOR FOR THE LOCAL
<br />AREA/DIVISION TO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENT THAT
<br />WAS INSTALLED IN THE BORE. THE CURRENT DRAIN TEST MUST BE PERFORMED PRIOR TO
<br />WELDING PIPE ON EITHER SIDE OF THE BORE.
<br />3. FOR THE INSTALLATION OF THE OMNIMETRIX RECTIFIER REMOTE MONITOR, CONTACT THE
<br />CORROSION SUPERVISOR FOR THE LOCAL AREA/DIVISION.
<br />4. BONDING CABLES TO BE INSTALLED ACROSS PIPELINE CUT-OUTS AT ALL LOCATIONS THE
<br />PIPELINE IS SEVERED PRIOR TO REMOVAL. CHAIN CLAMPS, MAGNETIC CLAMPS, OR OTHER
<br />CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND N6 (MIN) STRANDED CABLE SHALL
<br />BE UTILIZED. CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE IS TIED IN.
<br />RETIREMENT PROCEDURE FOR EXISTING PIPE:
<br />1, GT&D UTILITY WORK PROCEDURE TO 950OP-16, "DEACTIVATION AND/OR RETIREMENT OF
<br />UNDERGROUND GAS FACILITIES," SHALL BE FOLLOWED.
<br />2. THE EXISTING PIPE SECTIONS SHALL HAVE FREE LIQUIDS REMOVED AND BE 10096 PURGED
<br />PER GAS DESIGN STANDARD A-38, "PROCEDURES FOR PURGING GAS FACILITIES."
<br />3. THE PIPE SHALL BE SECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN.
<br />THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO
<br />IDENTIFY THE MOST OPTIMUM LOCATION IN THAT VICINITY. ACCURATE SURVEY DATA MAY
<br />NOT BE AVAILABLE FOR THESE LOCATIONS SO USE CAUTION DURING EXCAVATION AND WHEN
<br />IDENTIFYING THE PIPELINE TO BE RETIRED. OTHER ACTIVE PIPELINES MAY BE IN THE AREA.
<br />4. AT EACH SUCH LOCATION NOTED ABOVE, A PIECE OF PIPE AT LEAST 24" LONG SHALL BE
<br />REMOVED. INSTALL 1" HIGH PRESSURE SAVE -A -VALVE (H-17491, M022287) TO CHECK FOR
<br />PRODUCT AND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE. THE OPEN ENDS OFTHE
<br />RETIRED PIPE SHALL BE SEALED BY THE MOST APPROPRIATE METHOD OUTLINED IN GT&D
<br />UTILITY WORK PROCEDURE TD-950OP-16. BACKFILL MUST BE THOROUGHLY COMPACTED IN
<br />PLACE OF THE REMOVED SECTION OF PIPE.
<br />DESIGN CHANGE PROCEDURE
<br />MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT
<br />ENGINEER (PED) BEFORE MAKING ANY DESIGN CHANGE TO GAS FACILITIES PER TD -4014P-01.
<br />WE
<br />MYN MDGR
<br />CHKD RWA
<br />FOR CONSTRUCTION 74/11111 MDGRRAMA Ki11 oK
<br />DESCRIPTION PAt/SPEC U1YN CHAD SUPV APVU BY DATE 30/16/2U17
<br />nEEs
<br />REVISIONS AS SHOWN
<br />6 I 7 E.
<br />I
<br />CONTACT INFORMATION:
<br />PROJECT MANAGER
<br />---- MICHAEL BRADANINI
<br />925-206-9953
<br />CORROSION ENGINEER
<br />---- RYAN WOOD
<br />925-285-7838
<br />ESTIMATOR / DESIGNER
<br />---- MATT GOODWIN
<br />209-471-3695
<br />FIELD ENGINEER/CM
<br />---- TBD
<br />TBD
<br />LAND PLANNER
<br />---- TBD
<br />TBD
<br />E
<br />LOCAL CORROSION
<br />---- TBD
<br />TBD
<br />MECHANIC
<br />REFERENCE DRAWINGS:
<br />OPERATING MAPS ---- 384388 (REV 84)
<br />OPERATING DIAGRAMS ---- NA
<br />PLATSHEETS ---- 3111:G7
<br />PIPELINE - CONSTRUCTION NOTES
<br />L-002 MP 144.26 & L-401 MP 321.73
<br />INSTALL 300' DEEP WELL ANODE
<br />TRACY, CALIFORNIA
<br />GAS TRANSMISSION & DISTRIBUTION
<br />PACIFIC GAS AND ELECTRIC COMPANY
<br />SAN FRANCISCO, CALIFORNIA
<br />5 4 9 3
<br />14012041.5D02 -Qt. p
<br />mis
<br />0
<br />0
<br />A
<br />BILLOFMATL SHEET6
<br />DWG LISTTCKIN
<br />I n1�
<br />NUMBERG C" 1 0✓2
<br />SHEET NO. tH
<br />ry OF 6 SEETS
<br />74012941.1 0 z
<br />2 I 10 D INCH
<br />I
<br />60CT-2D17 Do;GOWA
<br />
|