Laserfiche WebLink
0 <br />I <br />0 <br />7- <br />2 <br />SUMMARY OF PROPOSED WORK: <br />1. DRILL 300' WELLAND INSTALL 16 ANODES. <br />2. INSTALL 40V/ 30A RECTIFIER, AIB, RMU, AND <br />AC DISCONNECT ON ADJACENT POLE. <br />3. CONNECT (2) N 6 AWG WIRES TO LINE 401 & 002, <br />RUN CATHODE CABLES TO CATHODE JUNCTION BOX. <br />4. RUN ANODE CABLES TO ANODE JUNCTION BOX. <br />5. INSTALL 2 GROUND RODS. <br />6. INSTALL CTS AT EACH PIPELINE. <br />7. MAKE 2 It 8 CONNECTIONS DIRECTLY TO LINE 002 & 401. <br />8. RUN THE CABLES INTO THE TUFF BOX BOND BOX. <br />9. EXPOSE CRIMSON PIPELINE AND TRENCH TO BOND BOX. <br />CRIMSON PERSONNEL WILL MAKE ALL CONNECTIONS TO <br />CRIMSON PIPE AND RUN CABLES TO TUFF BOX. <br />10. PG&E PERSONNEL WILL NOT MAKE ANY CONNECTIONS <br />TO CRIMSON PIPELINE. <br />SEQUENCE OF OPERATIONS: <br />1. DRILL 300' WELL AND INSTALL 16 ANODES. <br />2. INSTALL 40V / 30A RECTIFIER, AIB, RMU, AND <br />AC DISCONNECT ON ADJACENT POLE. <br />3. CONNECT (2) N 6 AWG WIRES TO LINE 401 & 002, <br />RUN CATHODE CABLES TO RECTIFIER. <br />4. RUN ANODE CABLES TO ANODE JUNCTION BOX. <br />5. INSTALL 2 GROUND RODS. <br />6. INSTALL CTS AT EACH PIPELINE. <br />7. MAKE (2) N 8 AWG WIRE CONNECTIONS DIRECTLY <br />TO LINE DD2 & 401. <br />8. RUN CABLES INTO THE TUFFBOX BOND BOX, <br />1 <br />2 <br />�I 3 <br />CONSTRUCTION NOTES: <br />5 °I <br />GENERAL REQUIREMENTS: <br />1. UNDERGROUND SERVICE ALERT: <br />CALL 811 (1-800-227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT INCLUDING INITIAL DAY OF <br />CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, INCLUDING ALL <br />NON -UTILITIES BEFORE YOU DIG, GRADE, OR EXCAVATE. <br />2, UTILITY NOTES: <br />A. DIMENSIONS SHOWN ON THESE DRAWINGS ARE BASED ON THE BESTAVAILABLE INFORMATION <br />FROM SEVERALSOURCES, AND SHALL BE VERIFIED IN THE FIELD BY CONSTRUCTION PERSONNEL <br />PRIOR TO FABRICATION. <br />B. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF <br />UNDERGROUND UTILITIES, PROPERTY LINES, AND OTHER SUBSTRUCTURES IS NOT GUARANTEED <br />TO BE ACCURATE OR ALL-INCLUSIVE, UNLESS OTHERWISE NOTED. CONSTRUCTION PERSONNEL <br />ARE RESPONSIBLE FOR MAKING ALL DETERMINATIONS AS TO THE TYPE AND LOCATION OF <br />UNDERGROUND UTILITIES AND OTHER SUBSTRUCTURES AS NECESSARY TO AVOID DAMAGE OR <br />ENCROACHMENTS. <br />C. PROSPECTING IS REQUIRED AHEAD OF WORK. ALL OFFSETS OR ROPING WILL NEED TO BE <br />APPROVED BY THE PG&E PROJECT ENGINEER (PED), AND REDLINED DETAILS SHOWN ON PROFILE <br />AND CONSTRUCTION DETAILSHEETS OF EACH ADDITIONAL SUBSTRUCTURE. <br />D. ALL EXCAVATIONS WITHIN EXISTING STATIONS SHALL BE HAND DUG OR EXCAVATED USING SOFT <br />DIG METHODS (e.g. VACUUM EXCAVATIONS OR SIMILAR). <br />3. ELBOWS AND FIELD BE14DS: <br />A. ALL BENDS ARE SMOOTH FIELD BENDS, EXCEPT WHERE ELBOWS ARE SHOWN, FIELD BENDS <br />SHALL BE MADE IN ACCORDANCE WITH A-36, SECTION 4D. FIELD BENDS MAY BE USED IN LIEU <br />OF ELBOWS WHEN PREAPPROVED BY THE PG&E PROJECT ENGINEER (PED). <br />B. IN ORDER TO AVOID EXCESSIVE STRAIN ON THE PIPELINE, THERE SHALL BE A MINIMUM <br />SEPARATION OF 5 FEET BETWEEN A ROPED SECTION OF PIPELINE AND ANY ELBOWS OR FIELD <br />BENDS. <br />C. ALL ANGLES SHOWN IN THE PLAN AND PROFILE ARE APPROXIMATE AND SHALL BE CUT TO SUIT <br />FIELD CONDITIONS. <br />4. SEPARATION FROM OTHER STRUCTURES: <br />A. CROSSING UNDERGROUND FACILITIES: PG&E PIPELINE MUST BE INSTALLED WITH AT LEAST <br />24 INCHES OF CLEARANCE FROM ANY OTHER SUBSTRUCTURE/UTILITY NOT ASSOCIATED WITH <br />THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br />B. PARALLELING UNDERGROUND FACILITIES: THIS PIPELINE MUST BE INSTALLED WITH AT LEAST <br />5 FEET OF CLEARANCE FROM ANY OTHER UNDERGROUND STRUCTURE/UTILITY NOT ASSOCIATED <br />WITH THE PIPELINE UNLESS NOTED ON THE DRAWINGS. <br />5. RESTORATION AND CLEAN UP: <br />A. RESTORATION OF PUBLIC STREETS, SIDEWALKS, CURBS, ETC. ABOVE PIPE BEDDING SHALL BE IN <br />ACCORDANCE WITH THE LATEST CITY, COUNTY, OR AGENCY STANDARDS. <br />B. WHERE EVER THERE ARE ROW CROPS, THE TOPSOIL SHALL BE REMOVED TO A DEPTH OF 12" AND <br />STORED ON SITE. UPON COMPLETION OF CONSTRUCTION, THE TOPSOIL SHALL BE RESTORED. <br />TAKE CARE TO PREVENT MIXING OF TOPSOIL AND SUBSOIL. <br />6. DESIGN NOTES: <br />A.THIS DRAWING HAS BEEN CREATED BY REVIEW OF THE AS -BUILT DRAWINGS & RECORDS. <br />ACCURACY IS DEPENDENT UPON THE SOURCE DOCUMENT LISTED ON THE REFERENCE <br />DRAWINGS. <br />7. WELDING REQUIREMENTS: <br />A. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL <br />MANUALTD-4160M. ALL CANS OR SPOOLS SHALL BE A MINIMUM LENGTH OF ONE PIPE DIAMETER, <br />WHENEVER POSSIBLE. <br />B. INSTALL TEST STATIONS WITH THERMITE WELD CONNECTION IN ACCORDANCE WITH GAS T & D <br />CORROSION CONTROL MANUAL 0-10, 0-10.1 AND 0-10.2. <br />8. WELDING: <br />WHEN INTERNAL MISALIGNMENT EXCEEDS 0.094", BACKWELD ANY GIRTH WELD WHERE THERE IS <br />ACCESS TO THE INSIDE OF THE WELD. WHERE THERE IS NO ACCESS TO THE INSIDE OF THE WELD, <br />MACHINE BORING OR GRINDING IS REQUIRED. BACKWELDING, GRINDING, OR BORING MUST BE <br />DONE IN ACCORDANCE WITH THE APPROPRIATE UTILITY PROCEDURE IN THE GAS WELDING CONTROL <br />MANUAL TD -4160M. <br />9. STRENGTH TEST REQUIREMENTS <br />A. STRENGTH TESTING SHALL MEET PRESSURE AND DURATION REQUIREMENTS OF GAS STANDARD <br />A-34 AND SHALL BE CONDUCTED IN ACCORDANCE WITH UTILITY PROCEDURE TD -4137S. <br />B. ALL WELDS THAT HAVE NOT BEEN STRENGTH TESTED AND ALL FITTINGS SHALL BE SOAP TESTED AT <br />100 PSI AND AT OPERATING PRESSURE BEFORE COATING CAN OCCUR. <br />10, PAINTING AND COATING REQUIREMENTS: <br />A. ALL EXPOSED PIPE AND FITTINGS ARE TO BE PAINTED IN ACCORDANCE WITH GAS STANDARD <br />E-30. ALL COATING ON BURIED PIPE AND FITTINGS ARE TO BE APPLIED IN ACCORDANCE WITH <br />GAS STANDARD E-35. <br />B. FOR COATING SELECTIONS ON BURIED PIPE, SEE DIRECT BURIAL COATING SELECTIONS TABLE. <br />11. INSPECTION OF EXISTING PIPELINE: <br />A. WHENEVER EXISTING BURIED GAS FACILITIES ARE EXCAVATED DURING ENGINEERING OR DURING <br />CONSTRUCTION, FOLLOW TD-510OP-01 TO DOCUMENT PIPE INSPECTION. THIS APPLIES TO EXISTING <br />AND TO BE RETIRED FACILITIES. <br />B. EXISTING GIRTH WELDS, AT TIE-IN LOCATIONS, SHALL BE IDENTIFIED AND REMOVED IF PRACTICAL, <br />C. PRIOR TO TIE-IN, INSPECT COATING AND PIPE FOR DEFECTS, IF DEFECTS ARE FOUND, <br />CONTACT PED FOR GUIDANCE. <br />12. TIE-IN AND CLEARANCE PROCEDURE TO BE PREPARED AND PERFORMED IN ACCORDANCE WITH <br />THE FOLLOWING WORK PROCEDURES: <br />A. TD -4100-01, HOT AND COLD WORK METHODS FOR NATURAL GAS TRANSMISSION PIPELINE <br />SHUTDOWN AND TIE-IN. <br />B. TD -44415, GAS CLEARANCE PROCEDURES FOR FACILITIES OPERATING OVER 60 PSIG. <br />WARNING: <br />THIS DOCUMENT CONTAINS 0-k ' <br />CONFIDENTIAL, PROPRIETARY <br />INFORMATION THAT IS THE SOLE <br />PROPERTY OF PACIFIC GAS AND <br />ELECTRIC COMPANY AND IS <br />INTENDED FOR USE ONLY BY K '� <br />AUTHORIZED PACIFIC GAS AND ©PGSE CO. cj, Rap£1 Cdi3D9'S �7®B�iJ. 1 <br />ELECTRIC COMPANY EMPLOYEES ° p <br />AND ITS AGENTS, eJp � 6%YBP0 Noll dig. ND <br />e1 3 I 4 5 0� <br />C� <br />0 <br />13. COATING REMOVAL: <br />A. PERFORM THE FOLLOWING STEPS, IN ACCORDANCE WITH TD -4711P-01, BEFORE REMOVING <br />ASPHALTIC PIPE WRAP ON PIPELINES INSTALLED PRIOR TO 1972 (BASED ON PG&E ANALYSIS, <br />PIPE INSTALLED IN 1972 OR LATER DOES NOT HAVE PIPE WRAP THAT CONTAINS ASBESTOS): <br />1. REFER TO THE "EXISTING PIPE SPECS (PRE -1972)" STAMP TO DETERMINE IF A SAMPLE HAS <br />BEEN COLLECTED OR IF A SAMPLE IS REQUIRED: <br />a. "YES" REPRESENTS HISTORICAL RESULTS ARE AVAILABLE SHOWING THAT PIPE WRAP <br />CONTAINS ASBESTOS. NO SAMPLE IS REQUIRED. <br />b. "NO" REPRESENTS HISTORICAL RESULTS ARE AVAILABLE AND THE PIPE WRAP DOES NOT <br />CONTAIN ASBESTOS (CONTENT WAS NON DETECT). NO SAMPLE IS REQUIRED. <br />c. "UNKNOWN" REPRESENTS NO HISTORICAL RESULTS ARE AVAILABLE. A SAMPLE IS <br />REQUIRED IF THE PIPE INSTALLATION DATE IS PRIOR TO 1972. <br />2. WHEN A PIPE WRAP SAMPLE IS REQUIRED TO BE ANALYZED FOR ASBESTOS: <br />a. COLLECT SAMPLE PER TD -4711P-01 AND COMPLETE CHAIN OF CUSTODY FORM <br />TD-4711P-01-FOl. <br />b. FILE PINK COPY OF THE CHAIN OF CUSTODY FORM AND FINAL LABORATORY RESULTS <br />WITH THE AS -BU I LTS. <br />3. WHEN REMOVING PIPE WRAP THAT CONTAINS ASBESTOS, OR FOR EMERGENCY WORK, <br />FOLLOW TD -4711P-01 "PIPE WRAP REMOVAL, HANDLING AND DISPOSAL". <br />CATHODIC PROTECTION NOTES: <br />1. FOLLOW TD-510OP-01 TO DOCUMENT INTERNAL CORROSION AND EXTERNAL CORROSION <br />INSPECTION OFTHE PIPELINE. <br />2. UPON COMPLETION OF BORINGS, CONTACT THE CORROSION SUPERVISOR FOR THE LOCAL <br />AREA/DIVISION TO PERFORM CURRENT DRAIN TESTS ON THE PIPELINE SEGMENT THAT <br />WAS INSTALLED IN THE BORE. THE CURRENT DRAIN TEST MUST BE PERFORMED PRIOR TO <br />WELDING PIPE ON EITHER SIDE OF THE BORE. <br />3. FOR THE INSTALLATION OF THE OMNIMETRIX RECTIFIER REMOTE MONITOR, CONTACT THE <br />CORROSION SUPERVISOR FOR THE LOCAL AREA/DIVISION. <br />4. BONDING CABLES TO BE INSTALLED ACROSS PIPELINE CUT-OUTS AT ALL LOCATIONS THE <br />PIPELINE IS SEVERED PRIOR TO REMOVAL. CHAIN CLAMPS, MAGNETIC CLAMPS, OR OTHER <br />CONSTRUCTION MANAGEMENT APPROVED CLAMPS AND N6 (MIN) STRANDED CABLE SHALL <br />BE UTILIZED. CLAMPS TO REMAIN IN PLACE UNTIL PIPELINE IS TIED IN. <br />RETIREMENT PROCEDURE FOR EXISTING PIPE: <br />1, GT&D UTILITY WORK PROCEDURE TO 950OP-16, "DEACTIVATION AND/OR RETIREMENT OF <br />UNDERGROUND GAS FACILITIES," SHALL BE FOLLOWED. <br />2. THE EXISTING PIPE SECTIONS SHALL HAVE FREE LIQUIDS REMOVED AND BE 10096 PURGED <br />PER GAS DESIGN STANDARD A-38, "PROCEDURES FOR PURGING GAS FACILITIES." <br />3. THE PIPE SHALL BE SECTIONALIZED AT INTERVALS AS SPECIFIED IN THE RETIREMENT PLAN. <br />THE LOCATIONS CALLED OUT ARE APPROXIMATE AND ARE SUBJECT TO FIELD VERIFICATION TO <br />IDENTIFY THE MOST OPTIMUM LOCATION IN THAT VICINITY. ACCURATE SURVEY DATA MAY <br />NOT BE AVAILABLE FOR THESE LOCATIONS SO USE CAUTION DURING EXCAVATION AND WHEN <br />IDENTIFYING THE PIPELINE TO BE RETIRED. OTHER ACTIVE PIPELINES MAY BE IN THE AREA. <br />4. AT EACH SUCH LOCATION NOTED ABOVE, A PIECE OF PIPE AT LEAST 24" LONG SHALL BE <br />REMOVED. INSTALL 1" HIGH PRESSURE SAVE -A -VALVE (H-17491, M022287) TO CHECK FOR <br />PRODUCT AND PRESSURE PRIOR TO CUTTING INTO THE PIPELINE. THE OPEN ENDS OFTHE <br />RETIRED PIPE SHALL BE SEALED BY THE MOST APPROPRIATE METHOD OUTLINED IN GT&D <br />UTILITY WORK PROCEDURE TD-950OP-16. BACKFILL MUST BE THOROUGHLY COMPACTED IN <br />PLACE OF THE REMOVED SECTION OF PIPE. <br />DESIGN CHANGE PROCEDURE <br />MAINTENANCE AND CONSTRUCTION PERSONNEL MUST OBTAIN APPROVAL FROM THE PROJECT <br />ENGINEER (PED) BEFORE MAKING ANY DESIGN CHANGE TO GAS FACILITIES PER TD -4014P-01. <br />WE <br />MYN MDGR <br />CHKD RWA <br />FOR CONSTRUCTION 74/11111 MDGRRAMA Ki11 oK <br />DESCRIPTION PAt/SPEC U1YN CHAD SUPV APVU BY DATE 30/16/2U17 <br />nEEs <br />REVISIONS AS SHOWN <br />6 I 7 E. <br />I <br />CONTACT INFORMATION: <br />PROJECT MANAGER <br />---- MICHAEL BRADANINI <br />925-206-9953 <br />CORROSION ENGINEER <br />---- RYAN WOOD <br />925-285-7838 <br />ESTIMATOR / DESIGNER <br />---- MATT GOODWIN <br />209-471-3695 <br />FIELD ENGINEER/CM <br />---- TBD <br />TBD <br />LAND PLANNER <br />---- TBD <br />TBD <br />E <br />LOCAL CORROSION <br />---- TBD <br />TBD <br />MECHANIC <br />REFERENCE DRAWINGS: <br />OPERATING MAPS ---- 384388 (REV 84) <br />OPERATING DIAGRAMS ---- NA <br />PLATSHEETS ---- 3111:G7 <br />PIPELINE - CONSTRUCTION NOTES <br />L-002 MP 144.26 & L-401 MP 321.73 <br />INSTALL 300' DEEP WELL ANODE <br />TRACY, CALIFORNIA <br />GAS TRANSMISSION & DISTRIBUTION <br />PACIFIC GAS AND ELECTRIC COMPANY <br />SAN FRANCISCO, CALIFORNIA <br />5 4 9 3 <br />14012041.5D02 -Qt. p <br />mis <br />0 <br />0 <br />A <br />BILLOFMATL SHEET6 <br />DWG LISTTCKIN <br />I n1� <br />NUMBERG C" 1 0✓2 <br />SHEET NO. tH <br />ry OF 6 SEETS <br />74012941.1 0 z <br />2 I 10 D INCH <br />I <br />6­0CT-2D17 Do;GOWA <br />