My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DARCY
>
701
>
2800 - Aboveground Petroleum Storage Program
>
PR0537925
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 12:15:45 PM
Creation date
8/24/2018 6:13:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0537925
PE
2832
FACILITY_ID
FA0015755
FACILITY_NAME
Antonini Enterprises LLC
STREET_NUMBER
701
STREET_NAME
DARCY
STREET_TYPE
PKWY
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
701 DARCY PKWY
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\D\D ARCY\701\PR0537925\COMPLIANCE INFO PRE 2015.PDF
QuestysFileName
COMPLIANCE INFO PRE 2015
QuestysRecordDate
11/9/2016 5:50:13 PM
QuestysRecordID
3254178
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Antonini Enterprises <br /> Inspection Training <br /> Revised <br /> Purpose: <br /> The purpose of this training is to provide information on appropriate procedures for inspection of bulk <br /> storage petroleum above ground tanks and piping at the Antonini facility. <br /> Applicability: <br /> This training is applicable to Antonini employees who work around bulk petroleum materials and includes <br /> the maintenance crew. This training is intended to be provided to new hires within the first week of <br /> employment and to applicable employees on an annual basis. <br /> Training and Recurrence: <br /> The training will be taught in-house by Antonini Safety Supervisor and/or Maintenance Manager. Annual <br /> training will be provided during the First Quarter of each year.Training records will be retained by the Safety <br /> Supervisor for a period of no less than tree years. <br /> 1. General Inspection Details <br /> The purpose of regular inspections of the bulk petroleum above ground tanks(AGTs)and piping is to <br /> ensure the AGTs are not leaking and are well maintained.The following are general inspection guidelines <br /> specific to all AGTs at the facility: <br /> • Designated Antonini employees shall inspect AGTs on weekly schedule. <br /> • The designated inspection log shall be used by the designated employees to document the <br /> observations of all scheduled and non-scheduled inspections. <br /> • Completed inspection logs shall be submitted to the Safety Supervisor for permanent record keeping. <br /> • New inspection logs will be provided by the Safety Supervisor as needed. <br /> • Inspections shall focus on the exterior of the AGTs mindful of leaks or spills associated with each <br /> operational AGT. <br /> • Spills or leaks identified during weekly inspection shall be reported to Safety Supervisor or Maintenance <br /> Manager for corrective action.Sufficient detail of spill or leak shall be provided to allow Safety <br /> Supervisor or Maintenance Manager to make prompt and appropriate corrections. <br /> • Spills or leaks that are not corrected within one-week should be noted on inspection form and again <br /> reported to Safety Supervisor or Maintenance Manager for corrective action. <br /> 2. Specific Inspections for Bulk Diesel and Gasoline AGTs <br /> The bulk diesel and gasoline AGTs require specific inspection details: <br /> • Visually inspect the exterior condition of bulk diesel and gasoline AGTs,along seams and on top of the <br /> tanks to verify no leaks are present. <br /> • Visually inspect exterior of AGTs for any obvious signs of deterioration or corrosion. <br /> • Visually inspect all exterior piping(located between each AGT and fuel dispenser)to verify no leaks. <br /> • Visually inspect all fueling areas to ensure there are no spills from refueling efforts. <br /> • Spills or leaks identified during weekly inspection shall be reported to Safety Supervisor or Maintenance <br /> Manager for corrective action.Sufficient detail of spill or leak shall be provided to allow Safety <br /> Supervisor or Maintenance Manager to take prompt and appropriate action. <br /> • Spills or leaks that are not corrected within one-week should be highlighted on inspection form and <br /> again reported to Safety Supervisor or Maintenance Manager for corrective action. <br /> Page f of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.