Laserfiche WebLink
�r + Dynamic Back Pressure Test <br /> Afforda- 1 e 1 4162nd Street El TP 201.4 <br /> Galt, Ca. 95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: TEST DATE: 9/24/09 TIME: 1430 UST ❑ AST <br /> SITE NAME: FARMINGTON SHELL -- TECHNICIAN NAME: <br /> CIRCLE K Zane A.Nimmo SJV#0083 Ex 02/27/10 ❑ PT ® Startup Test ❑ Compliance Test <br /> Address:4391 ESCALON BELLOTA RD. <br /> City:FARMINGTON,CA 95236 1 declare, under penalty of perjury under the laws of the state <br /> of California that based on information and belief formed Inspector: <br /> Phone: after reasonable inquiry, the statements and information <br /> Contact: <br /> provided in the document are true, accurate,and complete. Present ❑ Not Present <br /> Confirmation#09-10331 TECH SIGNATURE: <br /> Permit or Facility#N 7987 <br /> #DISPENSERS 6 DISPENSER Make: WAYNE NOZZLE Make:HEAL PV Valve Make: HUSKY <br /> #TOTAL NOZZLES 12 Mode[: Model: 400 Model:5885 <br /> MANIFOLDED: Yes ® No❑ BALANCE ® ASSIST ❑ Assist Type: <br /> Tank Tank Tank Tank TOTAL <br /> Fuel Grade 87 91 ALL Initial pressure before testing-+1.52 "we <br /> #Nozdes per Tank 12 - 12 EQUIPMENT <br /> Actual Tank Capacity 14,095 6,009 20,104 20,104 Decay: Blockage: <br /> Gasoline Volume 8,185 2,092 10,277 10,277 Incline Manometer ❑ Incline Manometer ❑ <br /> Ullsge(apacity minus volume) 5,910 3,917 9,827 9,827 Ma nehelic Gua e <br /> g g ❑ Magnehelic Guage <br /> Phase 1 System Type:2pt EVR Coaxial 2—PT 2—PT 2-PT <br /> Digital Manometer ® Digital Manometer ❑ <br /> Initial Test Pressure(Inches Water) lo 2,0 Equipment Calibration Date: 8/3/09 <br /> 1.98 Drift Check End Value: .00 <br /> PSI 1 Minute(Inches water) Nitrogen Intro.Point: VA <br /> PSI @ 2 Minutes 1.96 <br /> PSI @ 3 Minutes 1.94 Allowable Fill Time A,2 scfm 6:27 <br /> PSI @ 4 Minutes 1.94 Time 1:2:33 <br /> Final Pressure @ 5 Minutes(Inches water) <br /> 1.94 Time 2: <br /> Allowable Final Pressure CA") 1.84 Time 3: <br /> Liquid Removal Check,Dynamic Back <br /> ------- PASS Pressure(if due),and Parts& <br /> ------- ------- ""'-- Repairs Are Listed on Page 2. <br />