Laserfiche WebLink
Stacy Rivera <br /> March 25, 2016 <br /> Page 4 <br /> hazardous waste hauler. From then on hazardous waste will be contained in a <br /> 15 gallon container with a lid and the appropriate hazardous waste labeling. The <br /> 15 gallon container will be placed in a 30 gallon containment drum used for secondary <br /> containment. <br /> 726 Aboveground valves, piping and appurtenances will be added to weekly inspections. <br /> 727 The owner has contacted Elite IV contractors about inspection. Elite IV will be using <br /> a company by the name of BZ Testing. The owner will submit the date of testing to <br /> EHD when it has been confirmed. Inspections will follow the amended SPCC Plan. <br /> 728 The SPCC Plan is being amended. (Dillon & Murphy will meet with EHD by <br /> April 8, 2016 to submit and/or review the amended SPCC Plan.) <br /> If you have any questions or concerns, please contact me. Thank you. <br /> Sincere <br /> n Mackey <br /> cc: Joe Murphy <br /> 5 <br />