My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:54:23 PM
Creation date
8/24/2018 6:23:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
12/19/2017 10:44:34 PM
QuestysRecordID
3750329
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C UNIFIED PROGRAM CONSULLUALB"rum- <br /> UNDERGROUNDSTORAGETANK. <br /> . MONITORING PLAN- Psge 1 of 2) <br /> 49x3 <br /> TYPE OF ACTION ❑ 1.NEW PLAN *;9�2.CHANGE OF INFORMATION <br /> 490.2 <br /> PLAN TYPE1.MONITORING IS IDENTICAL FOR AIL LISTS AT THIS FACILITY. <br /> one ikm only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( ' <br /> wk - <br /> I. FACII TP V INFORMATION <br /> i <br /> FACILITY)p#(Agency Use Only) <br /> t 3. <br /> BUSINESS NAME(Same as FACILITYNAME) <br /> 103. 1�. <br /> BUSINESS SITE ADDRESS �.a CITY <br /> IL EQUIPMENT STING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(c.g.,sensors,probes,byte leak detectors,etc.)must be perfo2medd e��L <br /> specified by'ihe equipmmt manufacmms'mslructions,or annually,whichever is mom Sequent,and that such work must be performed by qualified <br /> 23 OCR§2632,2634,2638,2641) 490.3. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 4943b <br /> NIL MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH TRIS PLAN. L SITE PLOT PLANWAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE VOLLOWING METHOD(S): a94s <br /> 1.CONIIN[JOUS ELECTRONIC TANK MONIMI OF ANNULAR ffia:ERSTIITAL)SPACE(S)OR SECONDARY CONTAINMENT <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) 4966 <br /> INM <br /> SECONDARY CONTAENT IS: %&DRY DRY ❑ b.LIQUIDFILLED ❑ o.PRESSUREED ❑&UNDER VACUUM 49M <br /> PANEL MANUFACTURER: V r a9o-z MODEL#: TL-S- rJC7 <br /> 411 <br /> LEAK SENSOR MANUFACTURER- e P C 490.9.�' I MODEL--ux (� 't-I a O 4 11 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WAL WTANKlSN.(23 CCR§2643) 490.13 <br /> PANEL MANUFACTURER ll MODEL#: <br /> 494-la. 49a-IS <br /> ICJ-TANK PROBE MANUFACTURER: MODEL#(S): <br /> b.DAH.Y/AIIGHTLY ❑ c.WEEKLY 49x16 <br /> LEAK TEST FREQUENCY' ❑ a CONTINUOUS ❑ 490.17 <br /> ❑ &MONTHLY ❑ e.OTHER(Specify): <br /> 49418 <br /> PROGRAMMED TESTS: ❑ a 0.1 gp b. ❑ b.02 gplL ❑ c.OTHER(Specify): 49419 <br /> a94z0 _ <br /> 3.MONTIHM STATISTICAL INVENTORY RECONCHLLITION(23 CCR§2646.1): <br /> 4.WEEKLY I/TANOAL TANKGAUGING(MIG)(23 CCR§2645). TESI'INGPERIOD: ❑ &36 HOURS ❑ b..60 HOURS ate, <br /> 49053 <br /> ❑ 5.TANK INTEGRITY T8S14NG(23 CCR§P2643.1): - - 49424 <br /> TEST FREQUENCY: ❑ a ANNUALLY ❑ b.BUNNIALLY ❑ c.OTHER(Specify): 49424 <br /> .9426 <br /> ❑99.OTHER (specify): 69037 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METROD(S)(Check all that apply) 49428 <br /> N.CONTINUOUS MONITORING OF PIPE/PIPING SUMOTH <br /> PS)AND ER SECONDARY CONTAINMENT WITH AUDIBLE ANTI <br /> VISUAL AI ARMS. (23 CCR§2636) 4942 <br /> SECONDARY CONTAINMENT IS:&.DRY ❑b.LIQUID FB.LED ❑c.PRESSURIZED ❑d UNDER VACUUM 49431 <br /> 49439 , MODEL#: �v - <br /> PANE].MANUFACTURER: V �( '" `(- 190-32I 490.33 <br /> LEAK'�SENSOR MANUFACTURER: - Qty - MODEL#(S): <br /> 490-34 <br /> PIPING LEAgALARM TRIGGERS AUTOMATIC PUMP(i-C,TURBINE)SHUTDOWN. Ata YES ❑b.NO 490-35 <br /> FAILIMRB/DISCONNEfMOM OF THE <br /> MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. R;a YES ❑b.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR(MELD)THAT ROUTINELY PERFORMS 3A g p.h.LEAK TESTS AND RESTRICTS ORSHUT <br /> OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED CCR 490-37 49436 <br /> MILD MANUFACTURER(S)7 - - Q MODEL#(S): ' <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT R UTINELY PERFORMS 3A gp.h.LEAK TESTS (23 CCR§2636) 49439 <br /> 490.46. 49041 <br /> E ID MANUFACTURER(S) MODEL#(S): <br /> 49042 <br /> PRCGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 02 g.p.b. ❑ 2.MO�IMIIM ANNUAL 0.1 g.ph. - 49443 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑&YES ❑b.NO 49044 <br /> ELLD FARAREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. [I a YES ❑b.NO <br /> Ej 4.PIPE INTEGRITY TESTING 49 4s -49446490-47 <br /> TESTFREQUENCY ❑ a ANNUALLY ❑ b EVERY 3 YEARS ❑ c.OTHERS 490.46 <br /> 5.VISUAL PR'E MONITORING. <br /> FREQUENCY E] &DAILY [Ib.WEEKLY ❑C.MIN.MONTHLY&EACH nhE SYSTEM OPERATED- x94.9 <br /> 7 AH.a.dfm . a..be . fuel ! a.I HSC 1.5 490.50 <br /> 6.SUCTION PIPING MEETS EXEMPTION CRITERIA(23 CCR§2636(.0 <br /> c...INGPER'I.3EAI.TIIAND:SAEEPP_:. ._ :. _fe :.,4',,,�,'.• . .E 'SYSTBM <br /> ❑ 99.OTHER(Specify) .99-53 <br /> UPCF UST-D(138007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.