Laserfiche WebLink
C, UNtr tru Mvu. v0-..vnovaua e.•,:,,., ..... <br /> UNDERGROUNDSTORAGETANKV <br /> MONITORING PLAN (Page 2 of 2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONMRING <br /> I. UDC MO NrrORING IS PERFORMED USING THE FOLLOWING METHOD <br /> -I.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY 113.ELECTRONIC STAND-ALONE <br /> 4.NO DISPENSERS ❑99.OTHER <br /> S ecify): <br /> PANEL MANUFACTURER: \.eC Qr— ro 410-11 , MODEL#: 36 C) 490'x. <br /> LFAKSENS02MANUFACTUREIt 2 —CaCrir 49057 MODEL#(S): Tqt-4 7HO490-94 <br /> .DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 121%&YES ❑b.NO 49°59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ;&a YES ❑b.NO a9oso. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a YES [3 b.NO 49"] <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a YES ❑b.NO 49osr <br /> 2.UDC aNSTRUCIION IS. M.SINGLE WALLED 112.DOUBLE-WALLED 490Q <br /> IF DOUBLE WALLED: 49 FIW <br /> UI1C INTERSTTITAL SPACE IS MONITORED BY: ❑I.LIQUID ❑2.PRESSURE ❑3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF TEM UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES ❑b.NO 490'M <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELDTESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br /> LEAK QMMOMM MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS IRED. CCR 644.1) <br /> M2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49oaa <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 4�7 <br /> VIIL RECORDKEEPING <br /> The following monitoemfacility. <br /> records are kept for this facilit <br /> 'RAlamr logs 49asa. Uf Visual Inspection Records 49 t, ❑Tank integrity testing results 49059< <br /> ❑SIR testing results(and supporting documentation records). 49MM ❑ Tank gauging results(and supporting documentation records). 490-eac <br /> &ATG Testing results(and supporting documentation records).49o5ar ❑ Corrosion Protection 60-day logs 49 88 <br /> Equipment maintenance and calibration records. 4vosan <br /> IX.TRAINING <br /> ❑Personnel with UST monitoring responsibilities are familiar with all ofthe following documents relevant to their job duties. 41 a % <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(RetpuraD 494696 <br /> 40 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Requved)49a690 _ <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4% d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49-6% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490997 <br /> ❑ SWACB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49069a <br /> ❑ OTFIER(Specify):6469x, <br /> This facititybas a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator-will train facility employees in the proper operation and maintenance ofthe UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation ofthe UST systems in a manner coosistem with the facility's best management practices <br /> ➢ The facility employee's rule with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regaidto spols and overfills as specified in the UST Response Plan <br /> ➢ Names ofoomact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COM MNTSIADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.4W71 <br /> rl <br /> 2z @ qs�o <br /> XI,PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator a responsible for ensuring that b)the daily/routine USE mondorng activities and manteoance of UST leak detection equipment covered by <br /> this plan occur,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The folio persm(s)are respo ible for perormng the monitoring and equipment maintenmce: <br /> p("NAME () 490-79%T1T[E kt!AJ 49077 <br /> NAME 490.7,( I'LE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action <br /> XII OWNER/OPERATOR SIGNATURE <br /> CFRTMCATION:I certify that the informatiogprovided herein is true and accurate to the best of my Imowled e. <br /> PPLICANT SIGNATURE 49046 DATE: _ <br /> 4W77 <br /> aaean , ❑a: ourir<m'o�rr <br /> 49o-7s :<.APPLICANT TTl'LE: 490-79 <br /> APPLICAtTr NAME(print): <br /> UPCF UST;D(122007)3/4 - <br />