Laserfiche WebLink
San Joaquin County Eniironmental Health Department <br /> • EC�1-iVED <br /> Ms. Elena Manzo <br /> RE: GEMCO Ripon Truck Plaza, Inc. OCT 1 9 2015 <br /> 1022 E. Frontage Road, Ripon ENVIRONMENTAL <br /> REi Project No. 15030 HFAI.7HMPAOT'Ackrr <br /> October 15, 2015 <br /> Item <br /> # Comments <br /> 613 The Owner/Operator met with me and understands the daily inspection, <br /> weekly inspection, and annual inspection records and reporting that needs <br /> to be done. Inspection sheets have been included in the SPCC Plan. <br /> 614 We have reviewed the SPCC Plan with the Owner/Operator and he has <br /> committed the resources and training for employees and personnel that will <br /> be at the site involved with the operation and maintenance of equipment. <br /> We have included an Employee Training Plan regarding discharge <br /> procedure protocol , rules and regulations, facility operations, knowledge of <br /> the SPCC Plan, and emergency response procedures. <br /> 615 The Owner/Operator, Kulwinder Johal, is designated as the person <br /> responsible for discharge prevention. <br /> 616 The Owner/Operator, Kulwinder Johal, is aware that periodic briefings and <br /> training of employees and personnel at the site will be made at least <br /> annually, and that it will at least be in conjunction with the annual <br /> inspection of the facilities. The briefings will include information about <br /> any prior spill responses and procedures since the last briefing. <br /> 702 The facility is designed to flow into the site drainage piping system if there <br /> is discharge. All the piping appears to be directed through the existing <br /> 4,500 gallon oil/water separator, which is then piped to the existing <br /> retention basin. The facility is designed to contain all stored oil/fuel. <br /> 712 Tanks are to be inspected monthly and annually, and whenever repairs are <br /> made. The qualifications of inspecting, testing, and repair personnel will <br /> be evaluated by the Owner/Operator. Integrity reports of the tanks will be <br /> provided and included with the inspection reports. The Owner/Operator is <br /> scheduling these inspections and tests and will be forwarding a copy of the <br /> results to EHD. <br /> 717 We have been advised that the Owner/Operator did have the liquid level <br /> sensing devices tested for proper operation. A copy of these reports will be <br /> provided by the Owner/Operator. <br /> Y://LDD://15030://Letters:/20151015San7oagninCoEnvHealthMs O B E RTSO N <br /> NG�nc ERING <br /> RE <br />