Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209) 468-3433 Web:www.sjgov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report do <br /> Facility Name: Facility Address: Date: <br /> GEMCO RIPON TRUCK PLAZA INC 1022 E FRONTAGE RD, RIPON March 18 2015 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE) missing or incomplete. <br /> The Professional Engineer(PE) certification is incomplete. No certification of the familiarity with the CFR 112 section <br /> requirements, no procedure for required inspections and testing, and no plan adequacy for this facility were noted. <br /> The PE certification must include all of the aspects in 40 CFR 112.3(d)(1), including attesting that the PE is familiar <br /> with 40 CFR Part 112, he or his agent has visited and examined the facility, the Spill Prevention, Control, and <br /> Countermeasure(SPCC) Plan has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards, procedures have been established for required inspections and testing, <br /> and the Plan is adequate for the facility. Immediately obtain a complete PE certification for the facility's SPCC Plan. <br /> Submit a copy of the completed certification to the EHD. <br /> This is a Class II violation. <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary. <br /> This facility had an ownership change in early 2014 and Tanks 1 and 2 were permanently closed, and no appropriate <br /> plan amendment to reflect these changes was prepared. The Spill Prevention, Control, and Countermeasure (SPCC) <br /> Plan must be amended when there is a change in the facility design, construction, operation, or maintenance that <br /> materially affects its potential for a discharge, within 6 months of the change, and implemented as soon as possible, <br /> not later than 6 months following preparation of the amendment. Immediately make all necessary amendments to the <br /> SPCC Plan to accurately represent the procedures and policies currently in place at the facility. <br /> This is a minor violation. <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments. <br /> The Professional Engineer(PE) certification is dated July 9, 2010. The facility had disconnected and blanked off all <br /> connecting lines on Tanks 1 and 2, however no plan amendment was prepared. These are technical amendments, <br /> requiring a PE certification within six months of amendment. A technical amendment is a change to the facility, <br /> tanks, procedures, materials, construction, design, or maintenance that materially increases or decreases the <br /> facility's potential for oil discharge. Immediately obtain a complete PE certification for the facility's SPCC plan. <br /> Submit a copy of the completed, certified SPCC plan to the EHD for review. <br /> This is a Class II violation. <br /> 601 CFR 112.7 Plan that does not follow the sequence specified in this section lacks a cross-referencing section. <br /> The Spill Prevention, Control, and Countermeasure (SPCC) Plan does not follow the order or requirements in 40 CFR <br /> Part 112, and a cross-reference was not provided. If you do not follow the sequence specified in 40 CFR 112 for the <br /> Plan, you must prepare an equivalent Plan and supplement it with a section cross-referencing the location of <br /> requirements in 40 CFR 112 and the equivalent Plan. Immediately amend the SPCC Plan that follows the order of 40 <br /> CFR Part 112 or include a cross-reference or to follow the required sequence. <br /> This is a minor violation. <br /> Received by Inspector: Phone: Date: <br /> (initial): ELENA MANZO, REHS (209) 953-7699 03/18/2015 <br /> mof 1 age 4 of 8 <br />