My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2800 - Aboveground Petroleum Storage Program
>
PR0516198
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:57:11 PM
Creation date
8/24/2018 6:23:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516198
PE
2832
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRONTAGE\1022\PR0516198\COMPLIANCE INFO 2000 - 2016 .PDF
QuestysFileName
COMPLIANCE INFO 2000 - 2016
QuestysRecordDate
12/19/2017 10:45:19 PM
QuestysRecordID
3750331
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Far:(209)468-3433 Web:www.sogov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> GEMCO RIPON TRUCK PLAZA INC 1 1022 E FRONTAGE RD RIPON March 18 2015 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan. <br /> The Spill Prevention, Control, and Countermeasure(SPCC) Plan lacks approval of the current site management; <br /> ownership change took place in early 2014. The SPCC plan must have the full approval of management at a level of <br /> authority to commit the necessary resources to fully implement the Plan. Immediately obtain required management <br /> approval for the SPCC Plan for this facility. <br /> This is a Class II violation. <br /> 604 CFR 112.7(a)(3) No facility diagram or didn't show location and contents of containers, transfer stations, and pipes. <br /> No detailed facility diagram was available for review. The Spill Prevention, Control, and Countermeasure (SPCC) Plan <br /> shall include a facility diagram which must mark the location and contents of each fixed storage container and the <br /> storage area where mobile or portable containers are located. It must identify the location of and mark as"exempt' <br /> underground tanks. It must also include all transfer stations and connecting pipes, including intra-facility gathering <br /> lines. Immediately prepare the facility diagram to include all of the required information. Submit a legible copy of the <br /> updated facility diagram to the EHD for review. <br /> This is a Class II violation. <br /> 605 CFR 112.7(a)(3) Plan failed to address facility layout, operations discharge prevention methods and containers. <br /> The storage capacity of the existing ASTs is inaccurate, the plan lists AST storage capacities as 15,000 gallons and <br /> not the existing 20,000 gallons. The following shall be addressed in the Spill Prevention, Control, and Countermeasure <br /> (SPCC) Plan: <br /> -type of oil in each fixed container and it's storage capacity. For mobile or potable containers, the type of oil and <br /> storage capacity for each container or an estimate of the potential number of mobile or portable containers, the types <br /> of oil, and anticipated storage capacities <br /> -discharge prevention measures including procedures for routine handling of products <br /> -discharge or drainage controls such as secondary containment, equipment, and procedures for the control of a <br /> discharge <br /> -countermeasures for discharge discovery, response, and cleanup <br /> - methods of disposal of recovered materials <br /> -contact list and phone numbers for the facility response coordinator, National Response Center, cleanup <br /> contractors, and all appropriate Federal, State, and local agencies. <br /> Immediately amend the SPCC Plan to include all required information. <br /> This is a Class II violation. <br /> Received by Inspector: Phone: Date: <br /> (initial): V I C& pQ kA ELENA MANZO, REHS (209) 953-7699 03/18/2015 <br /> MN' e5ofS <br />
The URL can be used to link to this page
Your browser does not support the video tag.