Laserfiche WebLink
• • <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sioov.orq/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> GEMCO RIPON TRUCK PLAZA INC 1022 E FRONTAGE RD, RIPON October 10, 2017 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 712 CFR 112.8(c)(6) Failed to test or inspect each container for integrity based on industry standards. <br /> No integrity testing has been conducted for the four diesel tanks,and the 55 gallon drum of waste diesel. <br /> Inspections and testing shall be conducted on all aboveground liquid petroleum containers larger than 55 gallons, <br /> and all 55 gallon drums of oil. Records of these inspections and tests shall be signed by the appropriate supervisor <br /> or inspector and kept on site with the Spill Prevention, Control,and Countermeasure(SPCC)Plan for a period of <br /> three years. Immediately begin necessary testing and inspections for all Aboveground Petroleum Storage Act <br /> regulated containers and maintain on site with the SPCC Plan. <br /> This is a repeat violation,Class II. <br /> 714 CFR 112.8(c)(8)(i-iv)Failed to provide each container with a high level monitoring device. <br /> 1)There was no high liquid monitoring device on the 55 gallon drum of waste diesel. <br /> 2)Diesel tank 3 was observed with a high liquid level sensing device with a small vision gauge facing away from the <br /> fill pipe.This vision gauge could not be seen or monitored from the fill pipe. <br /> At least one of the following devices must be installed in each container: <br /> -High liquid level alarm with audible or visual signal <br /> -High liquid level pump cutoff device set to stop flow at a predetermined content level <br /> -Direct audible or code signal communication between the container gauger and the pumping station <br /> -Fast response system,such as digital computer,telepulse, or direct vision gauge. If a direct vision gauge is <br /> being used for determining the liquid level of each tank, a person must be present to monitor gauges and the overall <br /> filling of the tanks. <br /> Immediately install an approved liquid level sensing device in accordance with CFR 112.8 and implement necessary <br /> procedures to ensure that the devices are fully functional and in use at all times during tank filling operations, or <br /> provide equivalence as allowed by CFR 112.7(a)(2). <br /> This is a Class It violation. <br /> 715 CFR 112.8(c)(8)(v)Failed to regularly test liquid level sensing devices to ensure proper operation. <br /> Liquid level sensing devices have not been tested for diesel tank 3. Procedures and frequency of testing for these <br /> devices were not addressed in the Spill Prevention, Control, and Countermeasure(SPCC)plan. Liquid level <br /> sensing devices must be installed in accordance with CFR 112.8 and shall be regularly tested to ensure proper <br /> operation. Immediately conduct all necessary testing of liquid level sensing devices, or provide equivalence as <br /> allowed by CFR 112.7(a)(2). <br /> This is a repeat violation,Class Il. <br /> 717 CFR 112.8(c)(10)Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas. <br /> An active leak of oily liquid was observed at the diesel fill pipe,and at the diesel fill motor.There was visible staining <br /> around the diesel fill pipe, and the diesel fill motor.Also,there was a bucket filled with oily liquid at the motor closest <br /> to tank 4.According to Dayal Dess(worker),the bucket was placed there because the piping sometimes leaks. <br /> Visible discharges which result in a loss of oil from a container, including but not limited to seams,gaskets, piping, <br /> pumps,valves, rivets,and bolts, must be promptly Corrected. Immediately fix the leak,clean the pooled discharge, <br /> and manage according to the California Code of Regulations Title 22 hazardous waste regulations. <br /> This is a repeat violation, Class II. <br /> FA0000650 PRO516198 SCO01 10/1012017 <br /> EHD 28-01 Rev.09122116 Page 9 of 11 Aboveground Petroleum Storage Act OIR <br />