My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
3112
>
2800 - Aboveground Petroleum Storage Program
>
PR0535482
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 3:46:58 PM
Creation date
8/24/2018 6:42:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535482
PE
2832
FACILITY_ID
FA0003790
FACILITY_NAME
LDS - STOCKTON BISHOPS STOREHOUSE
STREET_NUMBER
3112
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17910008
CURRENT_STATUS
01
SITE_LOCATION
3112 LOOMIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOOMIS\3112\PR0535482\COMPLIANCE INFO.pdf
QuestysFileName
COMPLIANCE INFO
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aboveground Petroleum Storage Act Inspection Report <br />Date: <br />February 02, 2016 <br />Facility Address: <br />3112 LOOMIS RD, STOCKTON <br />Facility Name: <br />LDS - STOCKTON BISHOPS STOREHOUSE <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California95205-6232 <br />Telephone:(209) 468-3420 Fax :(209) 468-3433 Web:www .sjgov .org /ehd <br />SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br />725 □ V □ R □ COS Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction CFR 112.8(d)(3) <br />726 □ V □ R □ COS Failed to regularly inspect aboveground valves, piping, and appurtenances CFR 112.8(d)(4) <br />727 □ V □ R □ COS Failed to conduct integrity and leak test on buried piping any time it is worked on CFR 112.8(d)(4) <br />728 □ V □ R □ COS Failed to adequately warn vehicles entering facility to protect piping and other transfer operations CFR 112.8(d)(5) <br />Other Violations <br />4010 □ V □ R □ COS Unlisted Administration/Documentation violation See below <br />4020 □ V □ R □ COS Unlisted Training violation See below <br />4030 □ V □ R □ COS Unlisted Operations/Maintenance violation See below <br />4040 □ V □ R □ COS Unlisted Release/Leaks/Spills violation See below <br />SUMMARY OF VIOLATIONS <br />(CLASS I, CLASS II, or MINOR - Notice to Comply) <br />Remarks Item # <br />101 HSC 25270.4.5(a) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112. <br />The SPCC Plan on site is not being fully implemented. No spill records were available on site. According to Mr. <br />Allmendinger, a diesel spill occurred in November 2015 from a leaking nozzle. The SPCC Plan states that all minor <br />spills shall be documented a form provided in Appendix F. All facilities which have an APSA regulated shell capacity <br />of 1,320 gallons or greater shall prepare and implement a written SPCC Plan which meets all of the requirements of <br />the 40 CFR Part 112. This plan shall be certified by a professional engineer in accordance with 40 CFR 112.3(d). The <br />spill report was completed at the time of inspection. <br />This is a Class II violation. <br />201 CFR 112.3(d) Plan certification by a Professional Engineer (PE) missing or incomplete. <br />The Professional Engineer (PE) certification is incomplete. The certification does not state that the PE visited the <br />facility and does not include statements regarding industry standard, inspections and testing or the adequacy of the <br />Plan. The PE certification must include all of the aspects in 40 CFR 112.3(d)(1), including attesting that the PE is <br />familiar with 40 CFR Part 112, he or his agent has visited and examined the facility, the Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan has been prepared in accordance with good engineering practice, including <br />consideration of applicable industry standards, procedures have been established for required inspections and testing, <br />and the Plan is adequate for the facility. Immediately obtain a complete PE certification for the facility's SPCC Plan. <br />Submit a copy of the completed certification to the EHD. <br />This is a Class II violation. <br />Page 3 of 6
The URL can be used to link to this page
Your browser does not support the video tag.