My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2800 - Aboveground Petroleum Storage Program
>
PR0528459
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:27 PM
Creation date
8/24/2018 6:53:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528459
PE
2832
FACILITY_ID
FA0010217
FACILITY_NAME
CALIFORNIA FREIGHT
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\19501\PR0528459\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
8/15/2018 6:45:14 PM
QuestysRecordID
3963189
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone: (209) 468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 3 of 3 <br /> OFFICIAL INSPECTION REPORT Date: 06-04-10 <br /> Facility Address: Ruan Transportation 19501 N Hwy 99, Acampo Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I, CLASS II, or MINOR-Notice to Comply) <br /> Routine Aboveground Petroleum Storage Act Inspection Report <br /> #1. Failed to prepare a written SPCC Plan in accordance with CFR § 112. Each owner/ operator shall <br /> prepare a spill prevention control and countermeasure plan and conduct periodic inspection of the storage <br /> tank to assure compliance with CFR § 112. Correct by preparing a SPCC plan that is fully certified by a <br /> Professional Engineer. Submit a copy of only the page that contains the information that the plan is reviewed <br /> and fully certified by a Professional Engineer. Certification must comply with CFR § 112.3(e). <br /> #7. Failed to retain a copy of the SPCC Plan on-site. A complete copy must be maintained onsite at the <br /> facility for review upon request by an inspector. Correct by maintaining a SPCC Plan certified by <br /> Professional Engineer on-site. <br /> #52. Failed to promptly correct visible discharges and remove accumulation of oil from container. In the <br /> secondary containment/ cement berm of the diesel and gasoline tanks, there is a large accumulation of <br /> rainwater, a small oil sheen and growth of algae. Correct by promptly removing the accumulation from the <br /> secondary containment. Remove the oil sheen from the accumulation and dispose of properly according to <br /> California Code of Regulation, Title 22, Hazardous Waste Regulations. Maintain good housekeeping around <br /> the tanks so that leaks and damages can be easily found. <br /> #57. Failed to regularly inspect aboveground valves, piping and appurtenances. There is dark diesel staining <br /> on the piping connecting to the fuel dispenser. It is difficult to determine if there are piping beneath the <br /> accumulation of rainwater and growth of algae. During inspection, assess the conditions of flange joints, <br /> expansion joints, valve glands and bodies, catch pans, pipeline support, locking of valves and metal <br /> surfaces. Correct by regularly inspecting aboveground valves, piping and appurtenance to be able to detect <br /> leaks or damages. <br /> Submit to SJC EHD within 30 days (07-04-10)- <br /> 1. <br /> 07-04-10):1. one copy of the completed `Return to Compliance Certification' <br /> 2. a corrective action statement for above violations <br /> Notes: <br /> 1. Diesel tank has a high liquid level pump cutoff device that is set to stop flow at a predetermined <br /> container content level: shut off valve. <br /> 2. Inventory product are recorded by drivers who receives fuel, a inventory measuring stick on the tank <br /> and the metered fuel dispenser. <br /> 3. Vehicles entering fuel station would unlikely not endanger oil transfer operation: all aboveground <br /> piping, tanks and fuel dispenser is enclosed within the cement berm. <br /> 4. Gasoline tank, per Joe Azevedo, is not in use. Tanks that are not in use must be "permanently <br /> closed" as defined in CFR § 112.2 <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($115). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector:Thuy Tr n Rec v d By: i Qv Titl <br /> (tel! 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.