My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1640
>
2800 - Aboveground Petroleum Storage Program
>
PR0541223
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:05:12 PM
Creation date
8/24/2018 7:42:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0541223
PE
2832
FACILITY_ID
FA0014999
FACILITY_NAME
Global Materials Management, LLC
STREET_NUMBER
1640
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1640 N Broadway Ave
QC Status
Approved
Scanner
FRuiz
Supplemental fields
FilePath
\MIGRATIONS\B\BROADWAY\1640\PR0541223\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
6/14/2018 3:41:59 PM
QuestysRecordID
3915887
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Teleph ne: (209) 468-3420 Fax: (209) 468-3433 Web:www.sjgov.org/ehd <br /> Aboveg ound Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Global Materials Management, LL C 1 1640 N Broadway Ave, Stockton August 30, 2016 <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Failure of Ian to fulfill basic requirements including a cross-referencing section ❑V ❑R ❑COS <br /> 602 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection, if applicable ❑V ❑R ❑COS <br /> 603 CFR 112.7(a)(3) Failed to a Jequately describe the physical layout of the facility in the Plan ❑V ❑R ❑COS <br /> 604 CFR 112.7((a)(3)(i) Plan failed to include oil type and storage capacity for each container ❑V ❑R ❑COS <br /> 605 CFR 112.7(a)(3)(ii) Plan failed to adequately discuss discharge prevention measures, including routine handling ❑V ❑R c COS <br /> 606 CFR 112.7(a)(3)(iii) Plan failed to adequately discuss facility drainage or drainage controls ❑V ❑R ❑COS <br /> 607 CFR 112.7((a)(3)(iv) Plan failed to include countermeasures for discharge discovery, response and cleanup ❑V ❑R ❑COS <br /> 608 CFR 112.7((a)(3)(v) Plan failed to address disposal methods for recovered materials ❑V ❑R ❑COS <br /> 609 CFR 112.7(a)(3vi), Plan failed to adequately contain procedures for reporting a discharge ❑V ❑R ❑COS <br /> 112.7(a4) <br /> 610 CFR 112.7(a)(5) Discharge rocedures are not adequately addressed if the facility has no response plan ❑V ❑R ❑COS <br /> 611 CFR 112.7(b) Plan failed o include a description of potential equipment failure or provide equivalence ❑V ❑R ❑COS <br /> 612 CFR 112.7(c) Plan failed o include secondary containment,diversionary structures, or equip to prevent discharge ■V ❑R ❑COS <br /> 613 CFR 112.7(,) Failure to p ovide appropriate secondary containment,diversionary structures or equipment ❑V ❑R ❑COS <br /> 614 CFR 112.7(d) PE certifie Plan failed to explain impracticability of containment/diversionary structures ❑V ❑R ❑COS <br /> 615 CFR 112.7(d) Failure to p rform integrity and leak testing when claiming secondary containment impracticability ❑V ❑R ❑COS <br /> 616 CFR 112.7(d)(1) Failure to p epare an oil spill contingency plan when claiming impracticability of structures ❑V ❑R ❑COS <br /> 617 CFR 112.7(d)(2) No written iommitment of manpower, equipment,and materials to control and remove oil discharge ❑V ❑R ❑COS <br /> 618 CFR 112.7(e), 112.8(c) Failed to conduct inspections or integrity tests or maintain records for 3 years ■V ❑R ❑COS <br /> (6) <br /> 619 CFR 112.7(f)(1) Failed to tr in personnel on discharge prevention ■V ❑R ❑COS <br /> 620 CFR 112.7(f)(2) Failed to d ignate a person accountable for discharge prevention ■V ❑R ❑COS <br /> 621 CFR 112.7(f)(3) Failed to sc edule and conduct discharge prevention briefings at least annually ❑V ❑R ❑COS <br /> 622 CFR 112.7(f)(3) Failure to c nduct spill prevention briefing for oil-handling personnel ■V ❑R ❑COS <br /> 623 CFR 112.7(g) Plan failed t address security of site and valves, lock out/tag out,and lighting ❑V ❑R ❑COS <br /> 624 CFR 112.7(g) Facility faile to implement security of site and valves,lock out/tag out, and lighting ❑V ❑R ❑COS <br /> 625 CFR 112.7(h) Plan failed t adequately discuss facility tank car and tank truck loading/unloading rack ❑V ❑R ❑COS <br /> 626 CFR 112.7(h)(1) Loading/unl ading rack containment system not adequate to contain spill ❑V ❑R ❑COS <br /> 627 CFR 112.7(h)(2) Failed to pr vide vehicular departure system for loading and unloading racks ❑V ❑R ❑COS <br /> 628 CFR 112.7(h)(3) Failed to ins ect lowermost drains and outlets prior to filling and departure of vehicles ❑V ❑R ❑COS <br /> 629 CFR 112.7(i) Failed to ev luate field constructed container for brittle fracture and take appropriate action ❑V ❑R ❑COS <br /> 630 CFR 112.7(k) Failure to pr vide general secondary containment or alternative for oil-filled operational equipment ❑V ❑R ❑COS <br /> SPCC Plan Re uirements for Onshore Facilities (excluding production facilities) <br /> 701 CFR 112.8(b)(1) Failure to en ure drainage from diked areas is restrained by valves or alternative method ❑V ❑R ❑COS <br /> 702 CFR 112.8(b)(2) Failed to usE manual open-and-closed design valves for the drainage of diked areas ❑V ❑R ❑COS <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.