My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1640
>
2800 - Aboveground Petroleum Storage Program
>
PR0541223
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:05:12 PM
Creation date
8/24/2018 7:42:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0541223
PE
2832
FACILITY_ID
FA0014999
FACILITY_NAME
Global Materials Management, LLC
STREET_NUMBER
1640
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1640 N Broadway Ave
QC Status
Approved
Scanner
FRuiz
Supplemental fields
FilePath
\MIGRATIONS\B\BROADWAY\1640\PR0541223\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
6/14/2018 3:41:59 PM
QuestysRecordID
3915887
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 868East Hazelton Avenue, Stockton, California 95205-6232 <br /> Teleph ne. (209) 468-3420 Fax: (209) 468-3433 Web:www.si og v.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Fr- <br /> SPCC <br /> ate: <br /> Global Materials Management, LLC 1640 N Broadway Ave, Stockton ugust 30, 2016 <br /> Plan equirements for Onshore Facilities (excluding production facilities) <br /> 703 CFR 112.8(b)(3), Failed toesign facility drainage system from undiked areas to retain in the facility LiV ❑R _COS <br /> 112.8(b)(4 <br /> 704 CFR 112.8(b)(5) Failed to p rovide two lift pumps for more than one continuous treatment unit ❑V ❑R ❑COS <br /> 705 CFR 112.8(c)(1) Container iot compatible with oil stored and/or storage conditions ❑V ❑R ❑COS <br /> 706 CFR 112.8(c)(2) Failed to provide and maintain adequate secondary containment ■V ❑R ❑COS <br /> 707 CFR 112.8(c)(3) Failure to )Ilow the criteria of this section while allowing drainage of uncontaminated rainwater ❑V ❑R ❑COS <br /> 708 CFR 112.8(c)(3)(iv) Failed to rT aintain records of drainage from diked areas ❑V ❑R ❑COS <br /> 709 CFR 112.8(c)(5) Failed top ovide corrosion protection for partially buried tanks ❑V ❑R 7-COS <br /> 710 CFR 112.8(c)(6) Plan failed to adequately discuss procedures to test or inspect each container for integrity ❑V ❑R ❑COS <br /> 711 CFR 112.8(c)(6) Failed to p rform scheduled tank tests or inspections by appropriately qualified personnel ❑V ❑R ❑COS <br /> 712 CFR 112.8(c)(6) Failed to+t or inspect each container for integrity based on industry standards ■V ❑R ❑COS <br /> 713 CFR 112.8(c)(7) Failed top ovide effective leakage control from defective internal heating coils ❑V ❑R ❑COS <br /> 714 CFR 112.8(c)(8)(i-iv) Failed to pliovide each container with a high level monitoring device ❑V ❑R ❑COS <br /> 715 CFR 112.8(c)(8)(v) Failed to r+ularly test liquid level sensing devices to ensure proper operation ■V ❑R ❑COS <br /> 716 CFR 112.8(c)(9) Failed to ot serve effluent treatment frequently enough to detect potential discharge ❑V ❑R ❑COS <br /> 717 CFR 112.8(c)(10) Failed top mptly correct visible discharges and/or remove accumulations of oil in diked areas ■V ❑R ❑COS <br /> 718 CFR 112.8(c)(11) Failed top vide sufficient secondary containment capacity for mobile or portable containers ■V ❑R ❑COS <br /> 719 CFR 112.8(c)(11) Failed to locate mobile or portable containers to prevent discharge ■V ❑R ❑COS <br /> 720 CFR 112.8(d)(1) Failed to tae corrective action on buried piping when exposed for any reason ❑V ❑R ❑COS <br /> 721 CFR 112.8(d)(1) Failed to pr 3vide corrosion protection for buried piping ❑V ❑R ❑COS <br /> 722 CFR 112.8(d)(2) Failed to ca /blank-flange connection at transfer point and mark its origin if not in service ❑V ❑R ❑COS <br /> 723 CFR 112.8(d)(3) Failed to d ign pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V ❑R ❑COS <br /> 724 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances ❑V ❑R ❑COS <br /> 725 CFR 112.8(d)(4) Failed to co iduct integrity and leak testing on buried piping any time it is worked on ❑V ❑R ❑COS <br /> 726 CFR 112.8(d)(5) Failed to ad equately warn vehicles entering facility to protect piping and other transfer operations ■V ❑R ❑COS <br /> Other Violations <br /> 4010 See below Unlisted Ad inistration/Documentation violation Lj V -L R L COS <br /> 4020 See below Unlisted Tra ning violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Op rations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Rel-ase/Leaks/Spills violation V R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS Il,or MINOR-Notice to Comply) <br /> Item # Remarks <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.