My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2800 - Aboveground Petroleum Storage Program
>
PR0528989
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 2:14:42 PM
Creation date
8/24/2018 7:49:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528989
PE
2832
FACILITY_ID
FA0003934
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\C\CORRAL HOLLOW\15999\PR0528989\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
8/30/2017 10:14:40 PM
QuestysRecordID
3614744
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y' <br /> Z015 San Joaquin County <br /> DEC 0 4 Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 �0 �f0 /6 <br /> ENVIRONMENIMepT one:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> Lawrence Livermore National Lab-Site 300 925 423-5026 September 30 2015 <br /> Facility Address: CERS to: <br /> 15999 W CORRAL HOLLOW RD Tracy, CA 95376 10154767 <br /> Inspection Contact: Title: Phone: <br /> John Scott Site Manager 925 422-1539 <br /> Inspection Type: - Program: <br /> ROUTINE INSPECTION-Operating Permit 2832-AST FAC 10 K-</=100 K GAL CUMULATIVE <br /> Consent For: I Consent Given By: <br /> M Inspection ❑ Photos ❑ Samples I John ScottM <br /> Site ana er <br /> CCR=California Code of Regulations HSC=Health and Safety Code CFR=Cotle of Federal Regulations <br /> V-Violation R=Repeat violation COS=Corrected on site during inspection <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 25270.4.5(a) Failed to prepare and implement a written SPCC Plan in accordance with CFR Part 112 ❑V ❑R ❑COS <br /> 102 HSC 25270.4.5(a) Failed to properly Gose a tank that is considered permanenUy closed o V ❑R to COS <br /> 103 HSC 25270.6(a) Failed to file Business Plan or annual facility tank statement ifcapacity is over 10,000 gallons to V ❑R to COS <br /> 104 HSC 2527D.6(b) Failed to submit APSA fees ❑V ❑R o COS <br /> 105 HSC 25270.8 Failed to report spills or releases of 42 gallons(one barrel)or more o V to R ❑COS <br /> 106 CCR 25185(c)(3) Failed to submit a written response within 30 days of receiving an inspection report to V ❑R ❑COS <br /> 107 HSC 25404(e)(4) Failed to report program data electronically ❑V o R n COS <br /> Requirement to Prepare and Implement a SPCC Plan <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE)missing or incomplete ■V ❑R ❑COS <br /> 202 CFR 112.3(,)(1) Failed to maintain a copy of the Plan on site i V ❑R n COS <br /> Amendment of SPCC Plan by Owners or Operators <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary o V ❑R ❑COS <br /> 302 CFR 112.5(b) Failed to review Plan once every five years and/or Implement any resulting amendments ❑V a R to COS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments ❑V ❑R ❑COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Plan that does not follow the sequence specified In this section lacks a cross-referencing section ❑V ,R ❑COS <br /> 602 CFR 112.7 Plan lacks approval of management to fully commit the necessary resources to implement the Plan o V ,R o COS <br /> 603 CFR 112.7(a)(2) Plan failed to discuss equivalent environmental protection,if applicable to V ❑R o COS <br /> 6D4 CFR 112.7(a)(3) No facility diagram or didn't show location and contents of containers,transfer stations,and pipes ■V ❑R ❑COS <br /> 605 CFR 112.7(a)(3) Plan failed to address facility layout,operations discharge prevention methods and containers ■V o R ❑COS <br /> 606 CFR 112.7(a)(4) Plan failed to contain procedures for reporting a discharge o V o R o COS <br /> 607 CFR 112.7(a)(5) Discharge procedures are not adequately addressed if the facility has no response plan o V ❑R to COS <br /> 608 CFR 112.7(b) Plan failed to include a description of potential equipment failure or provide equivalence ❑V ❑R to COS <br /> 609 CFR 112.7(c) Failed to provide secondary containment,diversionary structures,or equipment to prevent discharge o V ❑R o COS <br /> 610 CFR 112.7(d) Full or partial PE certified Plan failed to explain impracticability ❑V o R to COS <br /> 611 CFR 112.7(d)(1) Full or partial PE certified Plan failed to include spill contingency if no response plan submitted to V o R d COS <br /> 612 CFR 112.7(4)(2) No written commitment of manpower,equipment,and materials to control and remove oil discharge ❑V ❑R ❑COS <br /> Received by Inspector: ,,p Phone: Date: <br /> :led STACY RIVERA, Senior REHS � <br /> (initial) (209)468-3440 09/30/2015 <br /> Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.