My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLIFTON COURT
>
11605
>
1900 - Hazardous Materials Program
>
PR0540326
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2019 4:12:42 PM
Creation date
8/27/2018 1:34:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0540326
PE
1921
FACILITY_ID
FA0023051
FACILITY_NAME
KINGS CROWN PACKING INC
STREET_NUMBER
11605
Direction
W
STREET_NAME
CLIFTON COURT
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
11605 W CLIFTON COURT RD
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
93180Ann <br />Farms <br />Training and Drills <br />Ongoing training is essential for a successful Emergency Evacuation Plan. Employees will be trained on <br />the evacuation routes and assembly areas during orientation. Supervisors and Managers will be trained <br />in depth on this plan's procedures, as well as contingency plans. An evacuation drill will be performed <br />during the first third of the work season to ensure training has been properly administered. <br />The annual Evacuation Drill will be conducted according to the following guidelines: <br />The date of the Drill will be announced in advance to the Cooling Supervisor only. The <br />specific time of the drill on the scheduled day will be unannounced and initiated by the <br />Operations Manager or the Safety Officer by phone call to the Cooling Supervisor. <br />The Cooling Supervisor shall commence with the evacuation steps above (excluding <br />contacting 911). <br />After the evacuation process has concluded, the Cooling Supervisor shall evaluate the <br />effectiveness of the evacuation drill. The Cooling Supervisor, will prepare a follow-up <br />report that records details of the drill, and evaluates the effectiveness of the drill for <br />future training purposes. <br />o This report shall include, but not be limited to recording the following: <br />■ What time was the emergency evacuation signal given? <br />■ How much time was required to assemble all employees at the <br />assembly area and account for any missing employees? (DO include <br />time taken to identify any missing persons, do NOT include time taken <br />to subsequently search for these employees) <br />■ How much time was required (from the start of the drill) for the Cooling <br />Supervisor and his designee to search the facility and return to the <br />assembly area? <br />■ If any employees were identified as 'missing', why were they so <br />identified? <br />o Additionally, the following items should be evaluated: <br />■ Is the designated assembly area a safe location for all employees to <br />gather at once? <br />■ Was cooling equipment turned off during the evacuation process? If <br />not, which equipment and why? <br />■ Were any actual or potential hazards encountered during the <br />evacuation process that should be considered in future training plans? <br />■ What problems were encountered during the drill? <br />■ What steps can be taken to improve the evacuation process? <br />Revised: 08/24/2018 <br />S:\Users\Shaina\Employee & Facility Safety\Tracy HAZMAT\Kings Emergency Evacuation\Kings Crown Facility EAP 082418.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.