My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2020 9:26:53 AM
Creation date
9/4/2018 1:38:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�(1Ully <br />=°P SAN >JOAOUIN <br />,. COUNTY <br />��gL�;Faaj' Greatness grows here. <br />April 24, 2018 <br />Merlin Bowen <br />Gettler Ryan Inc. <br />6805 Sierra Court, Suite G <br />Dublin, CA 94568 <br />Re: Chevron #307709 <br />10858 Trinity Parkway <br />Stockton, CA 95219 <br />Environmental Health Department <br />Linda Turkatte, REHS, Director <br />Kasey Foley, REHS, Assistant Director <br />FILE COPY <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Michael Kith, REHS <br />Willy Ng, REHS <br />Muniappa Naidu, REHS <br />SR0079002 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br />application for a permit to: replace existing dispensers with Gilbarco Encore 700 Series 3+0/3+1 <br />dispensers, install Bravo B-2000 conversion frames, install Bravo Encore deflector plates, replace and <br />install new primary FLEX -1 NG EZ15 flex connectors in the STP sumps, install new OPW vapor and fill <br />spill containers on all product tanks, replace existing turbines with new Red Jacket turbines on all <br />product tanks, replace existing drop tubes and overfill prevention valves with new OPW 71 SO drop <br />tubes and overfill prevention valves, remove ball valve cages, replace existing line leak detectors with <br />new Veeder root PLLD line leak detectors, replace tank sump sensors with new Veeder root 209 sump <br />sensors, and cold start monitoring panel on the underground storage tank (UST) system at the above <br />noted address. The permit has been approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br />any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br />commencing work. All new addenda supersede the previous ones. <br />3. Contact Aaron Hang at (209) 468-3453 to arrange the following inspection appointments (a 48- <br />hour notice is required for inspection appointments). Please be aware that inspections for <br />emergency work must be scheduled within five days of permit approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br />monitoring has been restored to meet the requirements of Title 23 California Code of <br />Regulations and the Health & Safety Code. A copy of the alarm history shall be printed <br />prior to performing the "cold start" of the Veeder Root system and made available at the <br />time of EHD inspection <br />b. Leak detector test: Leak detector must be tested to confirm that the device can detect a <br />leak of 3 gallons per hour at 10 psi. <br />c. Overfill prevention verification: Measurement of drop tubes to verify 95% tank volume shut <br />off. Drop tube calculations must be provided prior to inspection. <br />d. Ball valve removal verification. <br />e. Spill bucket test: Verify minimum 5 -gallon capacity and pass a one hour hydrostatic test (or <br />equivalent). Proper drainage must also be verified. <br />f. Primary piping test: Witness tightness test performed by SWRCB licensed tank tester or <br />receive passing 0.1 gallon per hour test results from the PLLD (if installed). A visual <br />inspection is required for PLLD tested lines. <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.