My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 3:23:19 PM
Creation date
9/5/2018 11:28:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2013 - 2017
FileName_PostFix
2013 - 2017
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jun. 26. 2014 11:13AM <br />RECEIVED <br />UST SYSTEM RETROFIT OR REPAIR JUN 2 6 M14 <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />Site map enclosed? YESX NO[] ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan' is available on the jobsite as required by Title 8, V <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (Ir <br />94 "in piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST installation Application <br />pages 4-8 as necessary for a timely plan review): <br />M U0two C.Cm Dry f` i n. c \-K CU . <br />U �_V `S <br />v <br />a <br />0 <br />✓- 0 ,yj.p <br />List of equipment to be used (Attach manufacturer's specification sheets <br />]showing <br />'third -party approval): <br />0, Or <br />riLL 'SL -,Sr <br />v S/-16 r L4W_AF Ito <br />3 <br />q) <br />
The URL can be used to link to this page
Your browser does not support the video tag.