Laserfiche WebLink
May. 1, 2014 8.57AM <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />No, 4085 P. 4 <br />Page 23 of 26 <br />Facility is Not )~quipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are present, but vaere Not Tested C] <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard [] Professional Engineer <br />❑ Other (Spec) <br />Test Method Uscd: <br />❑ Pressure <br />❑ Vacuum 0 Hydrostatic <br />C1 Other (Sped) <br />Test Equipment Used: See attached testing procedures <br />Equipment Resolution: <br />171 Spill Box # j6? <br />/ Spill Box #1;7e' <br />gjC Spill Box #/7- Spin Box tf <br />Bucket Diameter & Brand: <br />2 <br />- <br />12 <br />-Bucket Depth: <br />Z kz' <br />Wait time between applying <br />pressure/vacuum/water and <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />1 2 - <br />Test End Time: <br />:0_7 <br />Final Reading (RF): <br />12 <br />15 min <br />Test Duration: l ar <br />4frwin I A <br />Change in Reading (Rr:-Rj): <br />_C <br />Pass/Fail Threshold or <br />Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />T_estesult: <br />!'ass ❑ jl?an <br />pass:- - r'uil <br />+'. <br />®.>egs$ -0 hail . <br />Q._, ..: . <br />Q `Pais .'....: F`u <br />Comments — (include information on repairs made prior to testing; and reeommendedfollow-up forfaded tests) <br />i <br />MAY 01 2014 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />