Laserfiche WebLink
May. 1, 2014 8:57AM No. 4085 P. 5 <br />Page 24 of 26 <br />9. SPILL/OVERFILL CONTAINMENT ]BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are present, but Were Not Vested 0 <br />'fest Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure ❑ vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: See attached testing procedures <br />f Spill Box # V Spill Box # VA <br />Bucket Diameter & Brand: 12 i Z <br />Equipment resolution: <br />Spill Box # <br />Spill Box # <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />-starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />9"37- <br />9:,3,2 <br />Initial reading (rr): <br />4- <br />Test End Time: <br />�,; <br />Final reading (Rx): <br />-Y 22se <br />"1. 9969 <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in reading (RF -r,): <br />. ed le z <br />, peps <br />Pass/Fail Threshold or <br />Criteria: <br />0.002 <br />0,002 <br />0.002 <br />0.002 <br />T�st:Re�ult:, -:�.. _ .::= .:::. <br />®Pass ❑�)�'ai1: <br />_- ®-,Pass _❑ )Fail =:-.�❑ <br />Vass; ❑-)Rail' <br />�.P►ass. ❑ p'ail- <br />Comments — (include infor oration on repairs made prior to testing, and recommended follow-up for failed tests) <br />RECEIVED <br />MAY 01 2014 <br />ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />