Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: 329.01 <br />Complete the following checklist: <br />REGE_ivt-=L <br />APR 1 1 20116 <br />ENVIHUNMENTAL <br />u!7AITW nrma7Tkfr_RI- <br />• Yes <br />r No* <br />Is the audible alarm operational? <br />• Yes <br />r No* <br />Is the visual alarm operational? <br />• Yes <br />(' No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />(� Yes <br />r No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br />heir proper operation? <br />r Yes <br />r No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />r N/A <br />+ Yes <br />r No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring <br />system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check <br />N/A <br />all that apply) F� Sump/Trench Sensors; F] Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? Gi Yes; Q No <br />• Yes <br />r No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill <br />(' N/A <br />prevention valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If <br />so at what percent of tank capacity does the alarm trigger? 90% <br />Le Yes* <br />r No <br />Alas any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E below. <br />771 Yes* <br />r No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />Product; ri Water. If yes, describe causes in Section E below. <br />+' Yes <br />(' No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />Yes <br />(' No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />s-3 463 and s-5 464 sensors, die I.d. failed initial testing. s-3 and s-5 sensors were replaced. die syphon jet valve was replaced. 200 gal of die was purged. all <br />test passed. v.r. battery replaced. <br />Monitoring System Certification Page 2 of 4 12/07 <br />