My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 3:23:19 PM
Creation date
9/5/2018 11:28:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2013 - 2017
FileName_PostFix
2013 - 2017
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGOVED <br />APR 1 1 2016 <br />F. In -Tank Gauging / SIR Equipment: r Check this box if tank gauging is used onlR'r w6ototy c8ntrd1 <br />r Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />(� Yes <br />(' No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />r Yes <br />r NW <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />• Yes <br />i' No* <br />Was accuracy of system product level readings tested? <br />• Yes <br />r No* <br />Was accuracy of system water level readings tested? <br />• Yes <br />t" No* <br />lWere all probes reinstalled properly? <br />• Yes <br />(' No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />I In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): I_ -I Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes <br />No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? (Check a# that <br />t� <br />i N/A <br />apply) Simulated leak rate: P 3 g.p.h.; [10.1 g.p.h; 0.2 g.p.h. <br />(� Yes <br />(' No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />i' Yes <br />{' No* <br />Was the testing apparatus properly calibrated? <br />(' Yes <br />i� No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />t: N/A <br />Yes <br />C No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />i N/A <br />(� Yes <br />No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />f- N/A <br />monitoring system is disabled or disconnected? <br />• Yes <br />�' No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />N/A <br />monitoring system malfunctions or fails a test? <br />• Yes <br />(' No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />(' N/A <br />Yes <br />(~ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 4 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.