Laserfiche WebLink
SWRCB, January 2002 Page 1 of 1 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes r <br />Spill/Overfill Containment Boxes are Present, but were Not Tested r <br />Test Method Developed By: Spill Bucket Manufacturer P Industry Standard r Professional Engineer <br />r Other (Specify): <br />Test Method Used By: r Pressure r Vacuum r Hydrostatic <br />r Other (Specify): <br />Test Equipment Used: VACUUM TEST Equipment Resolution: 0.1 gph <br />Spill Box # Tank T-2 <br />PREMIUM - Fill I - <br />Direct - Grade level in <br />containment sump <br />Spill Box # Tank 'I I <br />UNLEADED -Fill l - <br />Direct - Grade level in <br />containment sump <br />Spill Box # Tank T- 3 <br />Diesel - Fill 1 - Direct - <br />Grade level in <br />containment sump <br />Spill Box <br />Bucket Diameter: <br />12.00 <br />12.00 <br />12.00 <br />Bucket Depth: <br />14.00 <br />14.50 <br />14.00 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />0 min <br />5 min <br />- 0 min <br />min <br />Test Start Time: <br />13:30:00 <br />13:40:00 <br />13:32:00 <br />Initial Reading (Rt): <br />30.00 in. H2O <br />14.50 in. <br />30.00 in. H2O <br />Test End Time: <br />13:31:00 <br />14:40:00 <br />13:33:00 <br />Final Reading (RF): <br />30.00 in. H2O <br />14.50 in. <br />28.00 in. H2O <br />Test Duration: <br />I min <br />1 hr <br />1 min <br />Change in Reading (RF R1) : <br />0.00 in. H2O <br />0.00 in. <br />-2.00 in. H2O <br />Pass/Fail Threshold or Criteria: <br />-/-4.00 <br />-/-0.00 <br />+/-4.00 <br />+ - <br />Test Result: <br />Pass <br />Pass <br />Pass <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />WO: 2310197 <br />