My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2012 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:17:35 PM
Creation date
9/5/2018 2:09:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2012 - 2013
FileName_PostFix
2012 - 2013
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology <br />Emergency Stop (E -Stop / ESO) Periodic Inspection <br />Facility Information <br />Technician information <br />Site #: CHEVRON 307709 307709 <br />Date: 4/24/2013 <br />Address: 10858 TRINITY PKWY <br />Name: Jarrod Cooke <br />City / State: STOCKTON CA <br />Technician Signature: =� <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits (turbines, and <br />dispensers) are de -energized, and remain de -energized until they are re -set manually). The test procedures and guidelines shall be in accordance <br />with the E -Stop Testing Process. <br />SITE DATA <br />1 <br />Number of E -Stop switches INSIDE of the building: <br />1 <br />2 <br />Number of E -Stop switches OUTSIDE of the building: <br />3 <br />PERFORMANCE DATA <br />Yes <br />Na <br />NA' <br />3 <br />You have added or confirmed that all E -Stop locations are on the Site Diagram <br />(: <br />r <br />r <br />4 <br />Do all E -Stops shutdown power to ALL DISPENSERS <br />is <br />(" <br />r <br />5 <br />Do all E -Stops shutdown power to ALL STP's <br />(. <br />r <br />6 <br />Are ALL E -Stops clearly Labeled <br />f+ <br />dam` <br />r <br />7 <br />Are the TURBINE BREAKERS clearly identified / labeled <br />POSTTEST <br />8 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />(: <br />r <br />i <br />9 <br />All safety barricades and test equipment has been properly removed <br />(+ <br />r <br />10 <br />E -Stop was reset and all dispensing functions are normal <br />(. <br />(' <br />r <br />E -Stop Inspection Results <br />11 <br />PASS I FAIL I INCONCLUSIVE <br />Comments (Clearly describe any deficiencies found) <br />WO: 2310197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.