Laserfiche WebLink
Emergency Stop (E -Stop) Testing <br />Tai'nrV �(��Ogy Results & Checklist <br />Facility Information <br />Contractor Information <br />TEST Results <br />Site #: 307709 <br />Address: 10858 TRINITY PKWY <br />City, State: STOCKTON, CA <br />Zipcode: 95219 <br />Lead Technician: Jarrod Cooke <br />Name: Jarrod Cooke <br />Signature: <br />Date: 4/27/2012 <br />i. Pass or r Fail <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits (turbines, and <br />dispensers) are de -energized, and remain de -energized until they are re -set manually). The test procedures and guidelines shall be in <br />accordance with the E -Stop Testing Process. <br /># <br />The following information is to be completed. <br />X To Select <br />Yes <br />No <br />N/A <br />SITE DATA <br />1 <br />Number of E -Stop switches: 3__ <br />2 <br />Type of Switch? Push Pull Momentary Plain Light / Toggle Other: <br />(if Momentary type, locate and identify re -set button): behind front counter <br />3 <br />Type of Turbine Control Relay System (Electrical Distribution Center): <br />Brown Box rPower Solution rVOther rCustom Fabricated <br />4 <br />Type of Turbine Control Relays: Make: FE PETRO Model: mag vfc <br />5 <br />Type of Line Leak Detection: rMechanical rELD/CPT PPLLD <br />PERFORMANCE TEST <br />6 <br />Does the E -Stop shutdown power to the DISPENSERS <br />7 <br />Does the E -Stop shutdown power to the TURBINES <br />8 <br />Are the TURBINE BREAKERS clearly identified / labeled <br />9 <br />Did the E-Stop(s) function correctly <br />9A <br />If #9 is NO, briefly describe what was wrong: <br />9B <br />How was it corrected: <br />9C <br />If repair or E -Stop functionality can not be corrected same day (prior to leaving the site). The <br />technician MUST notified the Site Manager of the problem, place an "Out of Service" Tag on the E- <br />Stop(s), and identified an alternate mean for site shutdown in the event of an emergency. <br />POST TEST <br />10 <br />Site's fueling system is fully operational. <br />11 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />12 <br />All safety barricades, and any debris was been removed. <br />C <br />COMMENTS <br /># <br />Reference item # and describe observations/conditions where expectations are not met. <br />0:2302101 <br />