Laserfiche WebLink
Chevron Monitoring Certification Checklist <br />I...... .......... ..........___._._._._..__............. ........................ <br />.;._.__._...............-.__......__...___ <br />Store Number: 307709 ' Address: 10858 TRINITY PKWY STOCKTON CA 95219 I <br />_ .._...._.... __......__..__...__......__......._ ............ <br />Date: 4/24/2013 Technician: Jarrod Cooke Company: TANKNOLOGY INC. <br />(Y/N) Comments <br />Has the Veeder Root Battery been replaced prior to failsafe? <br />Tank 1- UNLEADE <br />Tank 2 - PREMIUM <br />Tank 3 - Diesel <br />Product <br />1 <br />2 <br />3 <br />Tank Type <br />e <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />(DW FRP, DW Steel, SW FRP) <br />Are gasoline spin on -filters replaced during testing for ethanol per <br />_ <br />Tank Diameter <br />118.00 <br />118.00 <br />119.50 <br />Annular Riser Height (measured) <br />(Cim Tek 300MB-10 or 400MB-10 or PetroClear 40510-A only) <br />Required (calculated) annular sensor length <br />N <br />Log? (YIN) <br />FRP tanks - see Note 1 below <br />185.26 <br />185.26 <br />187.62 <br />Steel tanks - see Note 2 <br />i <br />Is req'd annular sensor length marked with tape & <br />labeled with dimension <br />(Y/N, document w/ photo)? <br />Actual (measured) annular sensor length <br />(to marked point) <br />Are the DW pipe boots pulled back in tank sumps? <br />(YIN or N/A, note if can't be verified because clamshell is <br />NA <br />NA <br />NA <br />pointing down) <br />Are tank sump sensors back in their holders and in the <br />correct position? <br />Y <br />Y <br />Y <br />(YIN or N/A document with photo) <br />i <br />(Y/N) Comments <br />Has the Veeder Root Battery been replaced prior to failsafe? <br />N <br />replaced on 4-23-13 <br />Has Veeder Root Programming before & after testing been verified? <br />y <br />(especially tank manifolding setup - see Note 3) <br />Has Veeder Root Programming before & after testing been attached to the <br />Y <br />Work Order? <br />Are gasoline spin on -filters replaced during testing for ethanol per <br />Chevron requirements <br />N <br />(Cim Tek 300MB-10 or 400MB-10 or PetroClear 40510-A only) <br />Have all alarms generated during testing been noted in the station Alarm <br />N <br />Log? (YIN) <br />Additional Comments: <br />303 brine annular sensors <br />Note 1: <br />............ ............ ...................... ..................... -.. ...................................... <br />DW FRP Tank Annular Calculations <br />(circumference) <br />X = ( 3.14 x tank diam/2 ) + riser height <br />10'diameter X=188"+riser <br />.......... <br />8' diameter € X =151"+ riser <br />................... _. <br />6' diameter X =113"+ riser <br />Note 2: DW Steel Tank Annular Calculation <br />X =tank diameter+ Riser Height <br />Note 3: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings anytime the programming is changed, such as when <br />sensors are temporarily X'ed out, etc. <br />