My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:15:12 PM
Creation date
9/5/2018 3:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2010 - 2011
FileName_PostFix
2010 - 2011
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulletin No. B2108 <br />MV FiberGlass System&October 1, 2007 <br />Bonded Double -Wall Sump <br />NOTE: This fitting can be bonded to a <br />flat fiberglass surface only. DO NOT in- <br />stall on thermoplastic or round sumps. <br />1. Determine entry hole location and <br />cut entry hole in sump wall using di- <br />mensions in Table 1. (Maximum allow- <br />able offset is 50.) <br />TABLE 1 - Fitting Dimensions <br />Size A <br />B C <br />In. In. <br />In. In. <br />3" x 2" 6.88 <br />4.00 4.00 <br />4" x 3" 6.88 <br />4.00 5.00 <br />2. Using 40-60 grit sanding surface, <br />sand the area around the hole where <br />the alignment rings will bond to the <br />sump. Lightly sand the rings. Remove <br />dust and wipe with solvent (optional). <br />Entry/Termination Fitting <br />3. Place two alignment rings on sump protector in place until '/4" fitting instal- <br />entry/termination fitting and insert lation. <br />through sump wall with the rings on 4. Dry fit primary pipe and rotate the <br />the outside of the wall. Locate the '/4' two rings until the desired angle is <br />threaded outlet to the desired loca- reached. Make alignment marks on <br />tion. If this fitting is used in an Open the rings, the fitting, and the sump wall. <br />(Drainage) System, locate the %" Be sure to mark the rings so they can <br />threaded outlet in the "South" posi- be placed in the same location and se - <br />tion. Leave '/4" plastic threaded outlet quence during bonding. <br />Adhesive Bead <br />Adhesive Bead <br />I I I <br />oe 01 <br />I I 1 <br />Retaining Ring <br />8 1 rademark of Varco I/P, Inc. FIBER GLASS SYSTEMS • A NATIONAL OILWELL VARCO COMPANY <br />www.smithfibercast.com 2700 W. 65th ST, LITTLE ROCK, AR 72209.501-568-4010 - FAX 501568-4465 <br />25 S MAIN ST., SAND SPRINGS, OK 74063.918-245-6651 - FAX 918-245-7566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.