Laserfiche WebLink
Bulletin No. B2108 <br />MV FiberGlass System&October 1, 2007 <br />Bonded Double -Wall Sump <br />NOTE: This fitting can be bonded to a <br />flat fiberglass surface only. DO NOT in- <br />stall on thermoplastic or round sumps. <br />1. Determine entry hole location and <br />cut entry hole in sump wall using di- <br />mensions in Table 1. (Maximum allow- <br />able offset is 50.) <br />TABLE 1 - Fitting Dimensions <br />Size A <br />B C <br />In. In. <br />In. In. <br />3" x 2" 6.88 <br />4.00 4.00 <br />4" x 3" 6.88 <br />4.00 5.00 <br />2. Using 40-60 grit sanding surface, <br />sand the area around the hole where <br />the alignment rings will bond to the <br />sump. Lightly sand the rings. Remove <br />dust and wipe with solvent (optional). <br />Entry/Termination Fitting <br />3. Place two alignment rings on sump protector in place until '/4" fitting instal- <br />entry/termination fitting and insert lation. <br />through sump wall with the rings on 4. Dry fit primary pipe and rotate the <br />the outside of the wall. Locate the '/4' two rings until the desired angle is <br />threaded outlet to the desired loca- reached. Make alignment marks on <br />tion. If this fitting is used in an Open the rings, the fitting, and the sump wall. <br />(Drainage) System, locate the %" Be sure to mark the rings so they can <br />threaded outlet in the "South" posi- be placed in the same location and se - <br />tion. Leave '/4" plastic threaded outlet quence during bonding. <br />Adhesive Bead <br />Adhesive Bead <br />I I I <br />oe 01 <br />I I 1 <br />Retaining Ring <br />8 1 rademark of Varco I/P, Inc. FIBER GLASS SYSTEMS • A NATIONAL OILWELL VARCO COMPANY <br />www.smithfibercast.com 2700 W. 65th ST, LITTLE ROCK, AR 72209.501-568-4010 - FAX 501568-4465 <br />25 S MAIN ST., SAND SPRINGS, OK 74063.918-245-6651 - FAX 918-245-7566 <br />