My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2010 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 1:15:12 PM
Creation date
9/5/2018 3:57:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO_2010 - 2011
FileName_PostFix
2010 - 2011
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bonded Double -Wall .ump Entry/Termination Fi._ing <br />5. Place one ring over the sump fit- <br />ting in the inside of the sump and rotate <br />to the desired angle. Make alignment <br />mark on both the sump wall and the <br />ring. <br />6. Mix one 7014 or 8014 adhesive for <br />each fitting per the instructions in the <br />adhesive kit. Mix in filler to thicken <br />adhesive (fiberglass alignment rings <br />will not seal properly without filler). <br />7. Apply adhesive generously, appro- <br />ximately 1/w, thick to the inside and <br />the outside of the sump walls where <br />the alignment rings are located. Coat <br />cut edges of the entry hole. Apply a <br />thin coating of adhesive to the bonding <br />surfaces of the alignment rings. <br />8. Line up rings with alignment marks <br />and press together firmly. <br />9. Slide the metal retaining ring over <br />inside section of sump fitting against <br />the alignment rings until they are tight <br />against sump wall. (A short section of <br />4" pipe may be used to drive the metal <br />retaining ring over the fitting.) Be sure <br />there is an adhesive bead visible <br />between the rings and the sump wall. <br />The metal ring must hold the assembly <br />in position while the adhesive cures. If <br />the assembly is not tight against the <br />sump wail, firmly press the entry fitting <br />against the outside sump wall while <br />pressing the metal ring against the <br />alignment ring on the inside. <br />10. Do not disturb assembly until the <br />adhesive is cured. This includes bond- <br />ing of pipe to the entry fitting and install- <br />ing the threaded outlet fitting. Clean <br />r The 1H' threads are a'modified NPT" , the Insemon of a <br />standard spec male thread is menimizod. <br />• SmUi Fibo oast 7U14 a 8014 adhostw Is rt ao tided <br />TTr. 114" female threads are filoorglass and cannot be tightened the <br />sant: as a metallic inroad. Tighten to 40 et -lbs or 1.5.2 turns <br />• After installing a 114" NPT tilting, the passa9ow0y to 8w <br />piping interstitial space should be cleared with air pressure to <br />Insure that it is free of thread sealant and/or adhesive. <br />excess adhesive from all bonding sur- <br />faces. See adhesive kit instructions for <br />cure times. <br />11. The use of an industrial hot air gun <br />may speed up the curing process. Do <br />not overheat. <br />12. Remove '/4" plastic threaded out- <br />let protector. Apply adhesive to the '/4" <br />fitting and screw into the 'W' threaded <br />outlet. Tighten to 40 in. -lbs. or 11/2-2 <br />turns past hand tight. After installing <br />fitting, be sure the interstitial space is <br />free from excess adhesive. Install a <br />short hose and blow excess adhesive <br />through the air passage. <br />13. Connect only flexible tubing or hos- <br />es to the '/4" side outlet. <br />NOTE: Tubing or hoses must be rated <br />to full vacuum. <br />TERMINATION EXAMPLE using <br />SUMP ENTRYrrERMINATION FITTINGS <br />Primary pipe <br />Spigot NETRed Thread IIAS <br />Concentric Reducer <br />C' O <br />771 ----------- <br />0 \ 0 <br />I ` <br />Sump Entry! Containment pipe <br />Rod Thread IIA <br />! Talrmewuon Fldeig <br />Use concentric reducer to connect the sump entryhermination <br />fitting to secondary containment pipe; DO NOT USE clamshell <br />termination fittings with this style fitting. <br />It is the policy of Fiber Glass Systems to improve its products continually. In accordance with that policy, <br />the right is reserved to make changes in specifications, descriptions, and illustrative material contained in <br />this bulletin as conditions warrant. Always cross-reference the bulletin date with the most current version <br />listed at http:flwww.fgspipe.com. The information contained herein is general in nature and is not intended <br />to express any warranty of any type whatsoever, nor shall any be implied. <br />MEMBER ISO 9001 <br />Vii rOtuIPMt NI INS, 4 <br />FIBER GLASS SYSTEMS <br />0 Trademark of Varco UP, Inc. FIBER GLASS SYSTEMS • A NATIONAL OILWELL VARCO COMPANY <br />wvvw.smithfibercast.com 2700 W. 65th ST, LITTLE ROCK, AR 72209.501-568-4010 • FAX 501-56"465 <br />Printed U.S.A. 1M1007 25 S MAIN ST., SAND SPRINGS, OK 74063.918-245-6651 • FAX 918-245-7566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.