Laserfiche WebLink
DOUBLEWALL 42- DIA, F.R.P,Q) 36" MULTIPORT MANHOLE G,C. SHALL PAINT THE FILL AND <br />CONTAINMENT SUMP RISER VENT PER DETAIL 12/F3,0 AND <br />TANK LEVEL MAGNETIC PROBE W/ 2" 90' BLACK IRON ELBOW REMAINING LIDS - FRAZEE #283 <br />MOTORING CAP AND ADAPTOR JUNCTION BOX EXPLOSION PROOF "MACHINE CRAY" <br />go, �_ 92 96 OF TANK (16 CU, INCH MIN.) <br />1" CONDUIT LOOPED TO PORT <br />2"x l'--O"x 1'-0" STYROFOAM J --BOX IN TURBINE MANWAY <br />VAPOR RETURN FLEX CONNECTOR <br />ENTRY BOOT FITTING <br />REGULAR UNLEADED TANK ILM <br />401 PREMIUM TANK EXTRACTOR FITTING <br />Q <br />EU <br />SUMP SENSOR <br />2" BELLXMALE F.R.P.41" <br />THREADED ADAPTOR RILL Q VR <br />VENT LINE FLEX <br />UEI <br />CONNECTOR - �41 <br />ENTRY BOOT FITTING <br />VAPOR RETURN LINE <br />3" F.R.P. W/ 4" SECONDARY (REGULAR) <br />2- F.R.P, W/ 3" SECONDARY (PREMIUM) 2" F,R,P. W/ 3" SECONDARY <br />CONTAINMENT CROSSOVER LINE TO <br />ENTRY BOOT FITTING TURBINE MANWAY FOR VAC TUBING <br />201 REGULAR UNLEADED TANK VACUUM CONNECTION TO <br />C22 PREMIUM 'TANK DOUBLE WALL VENT LINE FROM <br />VACUUM SENSOR ASSEMBLY TOP MEW <br />TEST BOOT REDUCER <br />r -\N, T. S, <br />U6 REGULAR UNLEADED P <br />'TANK LAN TEST BOOT REDUCER Q7 <br />- <br />27 PREMIUM TANK ENTRY BOOT FITTING (.22 <br />VACUUM CONNECTION TO DOUBLE WALL---- 2" F.R.P. W1 3- SECONDARY <br />VAPOR RECOVERY HEADER 0 REGULAR CONTAINMENT VENT LINE 'TO VENT <br />UNLEADED TANK ONLY RISER CONTAINMENT BOX <br />------------- 36" MULTIPORT MANHOLE 34 <br />- /--\ <br />TANK LEVEL MAGNETIC PROBE W1 91 Q9 (\9 <br />MOTORING CAP AND ADAPTOR VAPOR RETURN ADAPTER AND CAP <br />4" FILL ADAPTER AND 4" FILL TOP 30, 1-, <br />SEAL CAP <br />24" <br />BRINE RESERVOIR (NOTE: SHOWN FOR <br />CLARITY - <br />SPILL CONTAINER (VAPOR) <br />T.- <br />EXACT LOCATION IN UPPER POR11ON <br />OF SUMP PER MANUFACTURERS % <br />SPECIFICATION) <br />JUNCTION BOX EXPLOSION PROOF <br />(16 CU, INCH MIN,) <br />MINI HYDROSTATIC SENSOR 91 <br />2" x 1'-0" x V -O" STYROFOAM <br />PEA GRAVEL BACKFILL <br />SPILL CONTAINER (FILL) <br />VAPOR RETURN FLEX CONNECTOR <br />41 PREMIUM TANK . . .... <br />400 REGULAR UNLEADED TANK <br />DOUBLEWALL 42" DIA, FIBERGLASS SUMP RISER Q) <br />VAPOR RETURN LINE <br />3- F.R.P. W/ 4- SECONDARY (REGULAR) <br />2" F.R,P. W/ 3" SECONDARY (PREMIUM) li <br />ENTRY BOOT FITTINGOWN <br />REGULAR UNLEADED PRODUCT 201 <br />PREMIUM PRODUCT 22 __.I <br />TEST BOOT REDUCER <br />TANK COLLAR ___-._v..._ <br />FILL DROP TUBE <br />139 ........ <br />VACUUM CONNECTION TO DOUBLE WALL VAPOR ---•------- <br />RECOVERY <br />------ <br />RECOVERY HEADER FROM VACUUM SENSOR <br />ASSEMBLY, ONLY AT REGULAR UNLEADED TANK SECTION <br />STRIKER PLATES (TYP. UNDER ALL <br />OPENINGS) BY TANK MANUFACTURER <br />TANK LEVEL MAGNETIC PROBE SET AT 907 <br />CAPACITY FOR OVERFILL PROTECTION <br />F-DM16G.0"6 <br />TLM, FILL AND VENTIVAPOR MANWAY (BALL FLOAT) - REGULAR & PREMIUM UNLEADED <br />ASPHAL <br />BASE M <br />CLEAR CLEAR CLEAR CLEAR CLEAR <br />F-DT010F.DVOI <br />PIPE TRENCH DETAIL <br />(TYP•) <br />�G W/ <br />'AINMENT <br />N -Q -TE -'- <br />1, USE PIPE SUPPORT EVERY 8--D" O.C. <br />NO SCALE <br />ELECTRICAL SEAL, OFF EXPLOSION <br />PROOF <br />ENTRY BOOT FITTING <br />1" CONDUIT LOOPED TO J --BOX <br />IN TURBINE MANWAY <br />4" SCF1, 40 RISER <br />2- F.R,P, W1 3- SECONDARY <br />CONTAINMENT' CROSSOVER LINE TO <br />TURBINE MANWAY FOR VAC TUBING <br />, <br />ENTRY BOOT FITTING Q <br />2" F,R.P. W1 3" SECONDARY <br />CONTAINMENT VENT LINE TO VENT RISER <br />CONTAINMENT BOX <br />ENTRY BOOT FITTING Q2 <br />TEST BOOT REDUCER 27 <br />VENT LINE FLEX CONNECTOR401 <br />SUMP SENSOR LOCATED AT LOWEST <br />POINT (PROPERLY SECURED) <br />3"X2" DOUBLE TAP BUSHING <br />EXTRACTOR FITTING (`"6 <br />3"X2" DOUBLE TAP BUSHING <br />(ONLY 0 PREMIUM PRODUCT) <br />BALL FLOAT VENT/ VAPOR VALVE SET 0-8) <br />AT 95% CAPACITY <br />NO SCALE <br />2" 'FEE BLACK IRON <br />2" FIBERGLASS REINF <br />PRODUCT PIPE WIT11 <br />CONTAINMENT PIPE <br />2" NIPPLE x 3" LONE <br />2" ELL 90 DEGREE E <br />2" FULL. PORT BALL <br />TURBINE PUMP <br />�5 REGULAR & PR <br />( <br />49 DIESEL <br />DIESEL <br />3/4" FULL PORT BAI <br />W1 3/4' PLUG BY G <br />Winn, am= <br />ENTRY BOOT FITTING 24 <br />III <br />1" CONDUIT FROM J --BOX IN FILL./VAPOR <br />MANWAY <br />JUNCTION BOX EXPLOSION PROOF' <br />(16 CUBIC INCH MINIMUM) <br />ENTRY BOOT FITTING 22 <br />2- F.R.P. W1 3' SECONDARY <br />CONTAINMENT CROSSOVER LINE FROM <br />FILL/VAPOR MANWAY FOR VAC TUBING <br />DOUBLEWALL SUMP RISER W1 <br />LID & INSPECTION PORT 80 <br />BRINE RESERVOIR (NOTE: <br />SHOWN FOR CLARITY - EXACT <br />LOCATION IN UPPER PORTION <br />OF SUMP PER MANUFACTURERS <br />SPECIFICATION) <br />/Y <br />PEA GRAVEL BACKFILL <br />MINI HYDROSTATIC SENSOR <br />3/4" PLUG <br />3/4- FULL PORT BALL, VALVE (NORMALY CLOSED) <br />2" x 3/4" REDUCER BUSHING <br />2" X 2" X 2" TEE, BLACK IRON <br />1" CONDUIT HOME RUN FOR TURBINE PUMP <br />Il <br />ENTRY BOOT FITTING (24) — ------- <br />e <br />1 1/2" CONDUIT LOOPED" <br />OOPED TO J ---BOX IN <br />INTERSTITIAL MANWAY -- REGULAR UNLEADED <br />ENTRY Boor FITTING CO) <br />2" FULL PORT BALL VALVE <br />2" DIAMETER X 18" M x MS FLEX CONNECTOR <br />RISER <br />2" BELL x MALE NPT ADAPTER <br />F-DM24QD"16 <br />TURBINE SUMP <br />N TE <br />DOUBLE WALL PORTION OF TURBINE AND FILL SUMPS <br />MUST EXTEND TO BASE OF CONCRETE SLAB. <br />REGULAR <br />UNLEADED <br />ENTRY BOOT FITTING <br />VT <br />1 1/2' CONDUIT LOOPED TO J -BOX IN <br />INTERS1111AL MANWAY <br />1* CONDUIT HOME RIJN FOR TURBINE PUMP <br />ENTRY BOOT FITTING U4 <br />F-D'WD" <br />VAC SENSOR/VAC FLOAT IDENTIFICATION <br />MECHANICAL LINE LEAK DETECTOR <br />REGULAR & PREMIUM 0�0 <br />DIESEL0�01 <br />"TURBINE PUMP <br />REGULAR & PREMIUMC�5) <br />DIESEL 49) <br />X 18 0" X l' ---O" STYROFOAM <br />JUNCTION BOX EXPLOSION PROOF <br />(16 CUBIC INCH MINIMUM) <br />ELECTRICAL, SEAL OFF EXPLOSION <br />PROOF <br />DOUBLEWALL 42" DIA. FIBERGLASS <br />SUMP RISER <br />1" CONDUIT FROM J -BOX IN <br />FILL/VAPOR MANWAY <br />ENTRY BOOT FITTING 24 <br />2" F.R.P. W1 3" SECONDARY <br />CONTAINMENT CROSSOVER LINE FROM <br />FILL/VAPOR MANWAY FOR VAC TUBING <br />ENTRY BOOT FITTING (22 <br />2" FIBERGLASS REINFORCED PRODUCT <br />PIPE WITH 3" SECONDARY <br />CONTAINMENT PIPE <br />ENTRY BOOT FITTING 22 <br />TEST BOOT ASSEMBLY207 <br />SENSOR MOUNTING KIT <br />I <br />Q9 <br />SUMPSENSOR Q-9 LOCATED AT LOWEST <br />POINT(PROPERLY SECURED) <br />VACUUM 'TUBING (NOTE: 2 ONLY AT <br />REG. UNLEADED FOR VAPOR RECOVERY <br />HEADER) <br />VEEDER­ROOT VACUUM SENSOR <br />ASSEMBLY003 REG, r--\ PREM. & DIESEL <br />1�2)4 <br />(NOTE 3 -WAY BALL VALVE LOCATED AT <br />FLOAT SENSOR) NO SCALE <br />"` TION BOX EXPLOSION <br />)F (16 CU. INCH MIN.) <br />DIA. MANHOLE <br />LID Q-9 <br />)RED <br />R PIPE CAP 94 <br />2" CONDUIT FROM <br />)X IN: <br />3INE - REGULAR UNLEADED <br />DIESEL <br />IBERGLASS REINFORCED <br />(FRP) <br />2" CONDUIT HOME RUN <br />MONITORING <br />E LEVEL <br />LE --POINT HYDROSTATIC <br />3OR <br />�9_9 <br />E RESERVOIR <br />F­DT01913.1)" <br />ANNULAR SPACE MONITOR NO SCALE <br />PRODUCT PRODUCT DESIGNATION <br />REGULAR UNLEADED Ni LITE SOLID WITH BLACK CROSS <br />PREMIUM UNLEADED RED SOLID WITH WHITE CROSS <br />DIESEL SOLID YELLOW <br />VAPOR RECOVERY SOLID ORANGE <br />NQTE; <br />1. GENERAL CONTRACTOR SHALL PAINT EACH PRODUCT DESIGNATION <br />AS INDICATED ABOVE. <br />2. GENERAL CONTRACTOR SHALL PAINT THE INTERSTITIAL AND <br />TURBINE MANWAY LID FRAZEE #283 -MACHINE GRAY", <br />F--DTD,34A.DW01 <br />A <br />A <br />A- <br />A- <br />`,P,F S:l G; N, <br />all <br />MK TYPE: 8ECBRLN68 <br />JIB #: PROTOTYPE <br />ADDRESS: <br />10858 TRINITY PKY. <br />STOCK TON, CA 95219 <br />DRAWN BY: W[ -W—. -- <br />SCALE: AS NOTED <br />FUEL PIPING <br />1. TURN OFF POWER TO THE CONSOLE. <br />' <br />IDEPAR WENT/ <br />2. INSTALL THE VENT TUBE INTO THE CORD GRIP IN THE RISER CAP. <br />3. LOWER THE SENSOR INTO 'THE RISER UNTIL IT RESTS ON THE BOTTOM OF THE <br />RESERVOIR, NOTE: REFER TO THE TANK MANUFACTURER'S INSTRUCTIONS FOR SETTING <br />9330 BALBOA AVENUE <br />THE PROPER BRINE LEVELS. <br />SAN DIEGO, CA 92123 <br />4. LOOSEN THE CORD GRIP IN THE CAP AND PUSH THE END OF THE SENSOR CABLE <br />THROUGH THE CORD GRIP. DON'T 'TIGHTEN THE CORD GRIP AT THIS TIME. <br />C) 1999 Jack in the Box Inc. <br />5. INSTALL TFIE CORD GRIP FROM THE INSTALL KIT IN THE FIELD JUNCTION BOX. PUSH THE <br />I-l')ese drawings and specifications <br />SENSOR CABLE INTO THE DUCTION BOX THROUGH THE CORD GRIP. USING THE WIRE <br />are the property of Jack in the Box Inc <br />NUTS FROM THE INSTALL KIT, CONNECT THE SENSOR CABLE TO THE CONSOLE CABLE. <br />and shall not be copied or reproduced <br />without its previous written consent. <br />6. SEAL WIRE NUTS WITH EPDXY SEALANT. <br />7. PUSH THE EPDXY SEALED BAG INTO THE JUCNTION BOX. REPLACE AND 'TIGHTEN THE <br />JUNCTION BOX COVER, <br />6. TURN ON THE POWER 'TO THE CONSOLE. <br />dates <br />9. WITH THE SENSOR RESTING ON THE 'TOP OF THE TANK. MARK THE CABLE POSITION AT <br />THE RISER CAP WITH A PIECE OF TAPE, <br />RELEASE: OC T. 25, 2004 <br />10. PULL THE SENSOR UP UNTIL IT TRIGGERS AN ALARM ON THE CONSOLE. MARK THE <br />P.(JIB ONLY): <br />CABLE POSITION AT THE TOP OF THE CAP NTH A PIECE OF TAPE, <br />11. LOWER THE SENSOR UNTIL THE RISER CAP IS HALFWAY BETWEEN THE TAPED MARKS ON <br />PERMIT: <br />THE CABLE, <br />BID: <br />12. SECURE THE SENSOR IN POSITION BY TIGHTENING TT ­IE CORD GRIP IN THE CAP. TIGHTEN <br />THE CORD GRIP IN THE JUNCTION BOX. <br />CONSTRUCTION: <br />revisions <br />"` TION BOX EXPLOSION <br />)F (16 CU. INCH MIN.) <br />DIA. MANHOLE <br />LID Q-9 <br />)RED <br />R PIPE CAP 94 <br />2" CONDUIT FROM <br />)X IN: <br />3INE - REGULAR UNLEADED <br />DIESEL <br />IBERGLASS REINFORCED <br />(FRP) <br />2" CONDUIT HOME RUN <br />MONITORING <br />E LEVEL <br />LE --POINT HYDROSTATIC <br />3OR <br />�9_9 <br />E RESERVOIR <br />F­DT01913.1)" <br />ANNULAR SPACE MONITOR NO SCALE <br />PRODUCT PRODUCT DESIGNATION <br />REGULAR UNLEADED Ni LITE SOLID WITH BLACK CROSS <br />PREMIUM UNLEADED RED SOLID WITH WHITE CROSS <br />DIESEL SOLID YELLOW <br />VAPOR RECOVERY SOLID ORANGE <br />NQTE; <br />1. GENERAL CONTRACTOR SHALL PAINT EACH PRODUCT DESIGNATION <br />AS INDICATED ABOVE. <br />2. GENERAL CONTRACTOR SHALL PAINT THE INTERSTITIAL AND <br />TURBINE MANWAY LID FRAZEE #283 -MACHINE GRAY", <br />F--DTD,34A.DW01 <br />A <br />A <br />A- <br />A- <br />`,P,F S:l G; N, <br />all <br />MK TYPE: 8ECBRLN68 <br />JIB #: PROTOTYPE <br />ADDRESS: <br />10858 TRINITY PKY. <br />STOCK TON, CA 95219 <br />DRAWN BY: W[ -W—. -- <br />SCALE: AS NOTED <br />FUEL PIPING <br />