m
<br />ISD PRESSURE SENSOR
<br />SEE NOTE #11)
<br />VE.EDER-ROOT
<br />331946-00.1) ISO FLOWMETER
<br />ABOVE VAPOR
<br />A 1" SHEAR VALVE
<br />T 331847)
<br />(VEEDER--ROO
<br />PRESSURE SENSING PORT--
<br />JUNCTION BOX
<br />1/4" OD RIGID TUBING—-, - --------
<br />(CUSTOMER SUPPLIED)
<br />AS REQUIRED
<br />--- ------- -
<br />SEAL -OFF
<br />VAPOR RETURN
<br />J
<br />---- --------
<br />LINE SHEAR 1�1
<br />VALVE
<br />'—CONDUIT TO TLS
<br />CONSOLE' (SEE NOTE #2)
<br />1 /4"A 3 -WAY
<br />BALL VALVE of ivzl
<br />PITCH TUBING SLIGHTLY
<br />'TO AVOID LIQUID TRAPS
<br />IN LINE (1/4"/ FT MIN.)
<br />INSTALL FITTING INTO ---
<br />FIBERGLASS PIPING PER
<br />MANUFACTURER'S
<br />REQUIREMENTS
<br />2"0 VAPOR RETURN
<br />LINE
<br />U5 C6)
<br />—7`77D =S= =SFS R�_
<br />SEE NOTE #1)
<br />VEEDER--ROOT
<br />33194.6-00-1)
<br />PRESSURE SENSING FORT------..�
<br />1/4" OD RIGID TUBING
<br />AS REQUIRED
<br />VAPOR RETURN
<br />LINE SHEAR
<br />VALVE
<br />1/4" 3 -WAY` ---_
<br />BALL VALVE
<br />PITCH TUBING SLIGHTLY -
<br />'TO AVOID LIQUID TRAPS
<br />IN LINE (1/4"/ FT MIN.)
<br />INSTAL[,- FITTING INTO -----------------
<br />FIBERGLASS PIPING Pf,IR
<br />MANUFACTURER'S
<br />REQUIREMENTS
<br />2"0 VAPOR RETURN
<br />LINE
<br />N OTE S:
<br />1, ISD SYSTEM REQUIRES ONE VAPOR PRESSURE
<br />SENSOR PER FACILITY INSTALLED AT THE
<br />DISPENSER LOCATED CLOSEST TO THE 'TANK,
<br />2, FLOW METER AND VAPOR PRESSURE SENSOR
<br />WRING CAN SHARE THE SAME CONDUIT TO TLS
<br />PANEL., OBSERVE POLARITY!
<br />JUNCTION BOX
<br />(CUSTOMER SUPPLIED)
<br />CONDUIT "TO TILS
<br />CONSOLE (SEE NOTE #2)
<br />ISD FLOWMETER
<br />ABOVE VAPOR
<br />SHEAR VALVE
<br />(VEEDER-ROOT 331847)
<br />REQUIRED "Y" FITTING
<br />FOR INTRODUCING LIQUID
<br />DURING TP -201.4
<br />DYNAMIC BACKPRESSURE
<br />TESTING
<br />N OTES:
<br />1, ISD SYSTEM REQUIRES ONE VAPOR PRESSURE
<br />SENSOR PER FACILITY INSTALLED AT THE
<br />DISPENSER LOCATED CLOSEST TO THE TANK.
<br />2,FLOW METER AND VAPOR PRESSURE SENSOR
<br />WIRING CAN SHARE -THE SAME CONDUIT TO TILS
<br />PANEL, QUERVE PO�A]
<br />R-1 -T'tL
<br />1 1/2" DIAMETER PIPE RISER
<br />MULTI -PRODUCT DISPENSER
<br />STABILIZER BAR q5_9
<br />0
<br />TOP OF ISLAND
<br />DOUBLEWALL
<br />DISPENSER SUMP
<br />SENSOR MOUNTING (�
<br />KIT
<br />FLEX CONNECTOR
<br />(3) 1- CONDUITS __ ---
<br />POWER, MONITORING
<br />& FUTURE SPARE.
<br />(2) 3/4- CONDUITS
<br />-- INTERCOM &
<br />DATA
<br />ENTRY BOOT0?1 02�
<br />FITTING
<br />FDT021F,DV46
<br />DISPENSER SUMP DETAIL
<br />STABILIZER BAR
<br />rL
<br />TOP OF ISLAND
<br />UNION (FURNISHED BY
<br />MANUFACTURER)
<br />BRINE RESERVOIR (NOTE:
<br />SHOWN FOR CLARITY -
<br />EXACT LOCATION IN UPPER
<br />PORTION OF SUMP PER
<br />MANUFACTURERS
<br />SPECIFICATION) (65)
<br />DOUBLE SHEAR VALVE (SHEAR
<br />VALVE GROOVE. TO BE
<br />L
<br />INSTALLED FLUSH WITH TOP OF
<br />PUMP BLOCK) 67
<br />EZ -FIT CONNECTION
<br />4, x,
<br />4
<br />TEST BOOT REDUCERoi�
<br />ENTRY BOOT FITTING
<br />L
<br />2" FIBERGLASS REINFORCED
<br />PIPE LINES WITH 3"
<br />SECONDARY CONTAINMENT TO
<br />SUMP SENSOR908 LOCATED AT SLOPE 1/4" -TO REGULAR
<br />LOWEST POINT (PROPERLY SECURED) UNLEADED TANK,
<br />NO SCALE
<br />1" STREET 90' W1 1"0 NPT
<br />NIPPLE & UNION (SUPPLIED
<br />BY CONTRACTOR) TO BE
<br />CONNECTED W/ DISPENSER
<br />SEAL BOTTOM OF DISPENSER
<br />WITH SILICONE (REFER TO
<br />13/F2.0 GENERAL NOTE #7)
<br />VAPOR SHEAR VALVE 66
<br />DOUBLEWALL
<br />DISPENSER SUMP
<br />TEST BOOT REDUCER 21
<br />FLEX CONNECTOR
<br />- Q2
<br />ENTRY BOOT FITTING
<br />III ` � � �� �� ', � I I I µ,
<br />EZ -FIT CONNECTION
<br />2" FIBERGLASS REINFORCED
<br />PIPE LINES WITH 3*
<br />SECONDARY CONTAINMENT TO
<br />NOTE SLOPE 1/4" TO REGULAR
<br />1, CONDUIT SENSOR NOT SHOWN IN THIS VIEW UNLEADED TANK,
<br />FOR CIARITY
<br />F--D"I1021H.DWq8
<br />C7) VAPOR RECOVERY PIPING DETAIL @ DISPENSER NO SCALE
<br />1" STREET 90' W/ 1"0 NP
<br />STABILIZER BAR D69 NIPPLE & UNION (SUPPLIED
<br />BY CONTRACTOR) TO BE
<br />CONNECTED W/ DISPENSER
<br />SEAL BOTTOM OF DISPENSER
<br />a
<br />0 WITH SILICONE (REFER TO
<br />V) TOP OF ISLAND 13/F2.0 GENERAL NOTE #7)
<br />I i i -4J
<br />VAPOR SHEAR VALVE 66
<br />45' BLACK IRON ELBOW
<br />DOUBLEWALL
<br />DISPENSER SUMP (AS NEEDED)
<br />1/4" PLUG
<br />FLEX CONNECTOR
<br />1" x 1/4" DOUBLE TAP
<br />BUSHING
<br />ENTRY BOOT FITTING
<br />EZ -FIT CONNECTION
<br />T)A
<br />1 1/2" x 1 1/2" x 1" STREET TEE ---a,",t t, --. - - - - - , J - _ -1
<br />_777
<br />2" FIBERGLASS REINFORCED
<br />2" BELL, x MALE NPT ADAPTER TEST BOOT PIPE LINES WITH Y
<br />REDUCER 27 SECONDARY SECONDARY CONTAINMENT TO
<br />NOTE SLOPE 114- TO REGULAR
<br />1. CONDUIT & SENSOR NOT SHOWN IN THIS VIEW UNLEADED TANK,
<br />FOR CLARITY
<br />2, STREET TEE, DOUBLE TAP BUSHING AND PLUG ONLY
<br />IN DISPENSER CLOSEST TO TANKS, VERIFY LOCATION
<br />WITH FUEL PIPING LAYOUT PLAN (SHT, FS1,O)
<br />F--DTT)21G.DV#j8
<br />)i VAPOR RECOVERY PIPING DETAIL @ DISPENSER NO SCALE
<br />M411111331"d
<br />HOSE (WHIP) U11
<br />AKAWAY Q)6
<br />NOTE
<br />1. DISPENSERS SHOWN HAVE A TOP HOSE MOUNT.
<br />2. PRODUCT PIPING (HARD) MUST ALWAYS PENETRATE THE DISPENSER
<br />SUMP FROM THE OPPOSITE SIDE OF THE ELECTRICAL CONDUITS.
<br />F—MM.0024
<br />C4) DISPENSER ELEVATION
<br />'61) DISPENSER HOSE --
<br />(WHIP)
<br />0�2 HOSE BREAKAWA°
<br />(�� DISPENSER HOSE --
<br />�97) DISPENSER NOZZL
<br />"4j,kjLq",
<br />r,(�-,s r a 1) rr
<br />I��'
<br />DEPARTMENT
<br />�C-:` T
<br />9330 BALBOA AVENUE
<br />SAN DIEGO, CA 92123
<br />0, 1999 Jack in the Box Inc.
<br />These drawings and specifications
<br />are the property of Jack in the Box Inc
<br />and shall not be copied or reproduced
<br />without its previous written consent.
<br />dates
<br />RELEASE: OCT. 25, 2004
<br />P. .(JIB ONLY):
<br />PERMIT:
<br />BID:
<br />CONSTRUCTION:
<br />revisions
<br />A SUBMITTED ,8 06
<br />1/2' 1--1
<br />HOSE (NIP) 76
<br />r--\
<br />AKAWAY �69
<br />��N
<br />PNDUIT FOR
<br />OWER AND
<br />WIRE
<br />1/2" = 1'-0"
<br />X)
<br />LANDSCAPE ARCHTECTURE
<br />84GN51NG
<br />WRONWAL SERVICES
<br />3001 DmIgin Blvd #210
<br />Rosevie, CA 9%61
<br />Tek 06-771-2555
<br />Fax 06-771-9255
<br />Web: rWe*com
<br />(4)
<br />C10
<br />CA Mvtkwj, CA Rose&., CA
<br />ANCHOR BOLT
<br />Bekym, WA Pel Am CA
<br />SLOTS
<br />1" CONDUIT FOR
<br />RHL JOB#: JIB05002.2
<br />ETHERNET OR
<br />IFSF (WHEN
<br />site information
<br />REQUIRED)
<br />ROOM
<br />CSU
<br />MK TYPE: 8ECI3RL_N68
<br />N
<br />1/2" = 1'-0"
<br />ARCHITECM
<br />LANDSCAPE ARCHTECTURE
<br />84GN51NG
<br />WRONWAL SERVICES
<br />3001 DmIgin Blvd #210
<br />Rosevie, CA 9%61
<br />Tek 06-771-2555
<br />Fax 06-771-9255
<br />Web: rWe*com
<br />(4)
<br />13/16"°x1-7/16
<br />CA Mvtkwj, CA Rose&., CA
<br />ANCHOR BOLT
<br />Bekym, WA Pel Am CA
<br />SLOTS
<br />1" CONDUIT FOR
<br />RHL JOB#: JIB05002.2
<br />ETHERNET OR
<br />IFSF (WHEN
<br />site information
<br />REQUIRED)
<br />ROOM
<br />1--1/2* LOW
<br />MK TYPE: 8ECI3RL_N68
<br />PRODUCT INLET
<br />COUPLING
<br />JIB #: _4374
<br />ADDRESS:
<br />10858 TRINITY PKY.
<br />1-1/2" HIGH
<br />STOCKTON, CA 95219
<br />PRODUCT INLET
<br />COUPLING
<br />DRAWN BY: WLW
<br />1" NPT VAPOR
<br />SCALE: AS NOTED
<br />COUPLING
<br />DISPENSER
<br />1, CONTRACTOR TO FIELD VERIFY
<br />WN
<br />imam
<br />DISPFVSFR BISF WIVUS4US.
<br />
|