My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 2:28:59 PM
Creation date
9/7/2018 2:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL_2006
FileName_PostFix
2006
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. The entire tank system must comply with all requirements of HSC 25290.1. <br />16. Overfill prevention shall satisfy CCR 2635(b)(2)(C) pursuant to the permit application. <br />17. All metal components in direct contact with the ground such as flexible connectors, swing joints, <br />fittings, and pumps shall be cathodically protected. <br />18. Submit a Monitoring and Response Plan to EHD prior to the final inspection. <br />19. Submit the Best Management Practices to EHD for managing fuel spills& wash down water, and <br />for maintaining the storm drain system at this site prior to the final inspection. <br />20. The tank owner must submit the owner statement and name/ICC certification information for this <br />facility's "California UST System Operator" (Designated Operator) prior to the final inspection. <br />21. A "Certificate of Compliance for Underground Storage Tank Installation Form C" shall be <br />submitted by the owner or the owners' agent [pursuant to California Code of Regulation (CCR) <br />2635(d)] before this install will be considered complete by EHD. <br />22. An accurate and drawn -to -scale as -built plan must be submitted to EHD prior to scheduling a final <br />inspection. <br />23. Passing Enhanced Leak Detection (ELD) results must be received prior to the fuel being received. <br />Note: A separate permit application is required to install ELD. <br />24. Contact Lori Luces, REHS at (209) 468-0341 for inspections. See inspection checklist for the <br />required inspections. All appointments must be scheduled 48 hours in advance. <br />25. This permit expires at the end of the calendar year. A request for extension to this permit must be <br />received by December 31, 2006. <br />Please contact me at (209) 468-0341 with any questions regarding this permit. <br />Thank you, <br />Lori Laces, REHS <br />Registered Environmental Health Specialist <br />San Joaquin County <br />Environmental Health Department <br />cc: Jim Kent- Jack In The Box <br />RMG Construction <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.