My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 2:28:59 PM
Creation date
9/7/2018 2:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL_2006
FileName_PostFix
2006
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prepared by David Rabb <br />Approved by Randy Golding Tracer Research Qq <br />: TracerT�zp <br />G iideae Dare 01115104 Field Guideline v_9 <br />Lm,00rtant Notes: <br />1. Do not use helium onsite before a pretest Using helium before PSI arrival reduces our abilities to <br />locate leaks. <br />2. Do not put fuel in any part of the system. Placing fuel in the tanks before the test is completed <br />will add additional time to the test protocol which will increase cost . . <br />3. Flex connectors that will not tolerate M vacuum (29"of mercury) will increase cost of the <br />test, by requiring the test period to be extended We recommend using flex connectors that can <br />tolerate a full vacuum. Metal core, fire rated and possibly some non-metal flex connectors are rated <br />for full vacuum. If non-metal SIS braided connectors are installed follow the guideline and install <br />ball valves as needed (See attachment for differences.) <br />4. We must know what components you are using on your site in order to have 'the proper testing <br />equipment. Please give us this information ASAP. <br />5. Scheduling is important to you our dent. The more advance notice we receive, the better our <br />ability will be to service you on time. Please give Praxair a tentative start date the day you begin <br />construction. As schedule adjustments occur, please keep us informed. A* eek before you set the <br />tanks, please contact Praxair and give us a firm date for your ELD TracerTight Pre -Test. <br />6: 'There should be a construction crew onsite with all equipment, tools, and any supplies <br />necessary to complete any repair. <br />Site Conditions: <br />Pre -Test Evaluation <br />1)would lie to aive opsit-- ager the secondary piping has been installed and approved by <br />your reg--latorj ag Lcy. Do act �t ' covering piping until the pre-test is ccinpletad. <br />2) Diz7 enter su�;s st- -Ll be c=—z31 ted to the sheer valve. <br />Taut_ =aL uou r -11 -Luau be 1 eL� and not lea:�tn� into the tin :r <br />'t is best act to c:IeTw az <br />k _ s skimto fill heir <br />5) T azk sumps should be cGILpletGd including spill buckets with all plumb Ing <br />icomplet,-d. <br />7 Tanks SllGuld'ce rLady to pressurize to test pressure. If water ballast is used, do not fill tanks <br />completely. Leave a 12" or greater air space in the top. This will allow us to evaluate the top of the <br />tank only. <br />7) Have all piping in trenches supported by backfill so no stress is everted on the piping. (Do not <br />cover the sides of the piping.) <br />3) Every secondary bootlfttting must have a test sampling port or bypass system installed. <br />9) It is mandatory to have a secondary test port boot at the -far ends of each secondary section. <br />10) Third containment conduit must have test ports at each end of each containment section. <br />11)AlI product/Vapor return shear valves to be capped and primaries under 10 to 50 psi pressure and <br />holding. <br />12) Vent piping, vent r serfs should be completed to finish height, must be capped, and under 10 to 50 <br />psi pressure and holding. <br />13)All piping secondary lines shall have 5psi pressure. <br />14)For piping that includes Teflon flex connectors do the following: <br />a, Inst ill %" test ports with bail valves and r/4" barb fittings in all primary vent riser <br />c, Install 'W' gall valves with I/�" barb fittings in the test ports of all primar'j product & return sheer <br />v:,lve test, sorts <br />TF! %' !PIFOR:bGiTTU!`/!S '!tG['rR "%iF P LUvelR SER%Tc INC .liVD 7YL1(NGT38T^v11`ISL D. COPIED OR DISCLOSED. Til:VHOLE OR !tV P.1RT. <br />iYTTi-70 UT AZITTSN PLRtYIISSIGN tFROM PRA;&LLR S RVTCZ LNC. <br />i� .Sup i'17f I [C -LD i4,)r7Z0R[.7I ,0mbC:: V.` <br />
The URL can be used to link to this page
Your browser does not support the video tag.