My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 2:28:59 PM
Creation date
9/7/2018 2:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL_2006
FileName_PostFix
2006
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JGHL <br />ROUP INC. <br />June 12, 2006 <br />Plan Check Response <br />Jack -In -The -Box <br />Stockton, Ca <br />Page 2 of 2 <br />Comment #11 Please refer to Detail 5, Sheet F4.0. This detail, specific for the diesel tank fill <br />sump, does not indicate any Phase I or Phase II vapor return equipment. The <br />attachment points for these systems at the extractor assembly have been capped. <br />Diesel fuel is exempt from any Phase I and Phase H vapor return requirements. This <br />detail has not been revised. <br />Comment #12 Per California Air Resources Board Executive Orders the Healy System is the only <br />Phase II vapor recovery system allowed for installation. The Healy Vacuum Assist <br />system, and all components, including the clean air separator tank, will be an active <br />system and installed per manufacturer and CARB requirements. <br />Attached to this letter are three full sets of revised drawings as well as the items indicated above. <br />If you have any questions, additional comments or need additional information, please feel free to <br />call me at (916) 117-2555. <br />Design Group, Inc <br />Craig Morte <br />Job Captain <br />attachments <br />F:\ProjectU-J-K-LUIBUIB05002.0\DOCSUtr-eh plan check response 6-9-06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.