My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
230
>
2200 - Hazardous Waste Program
>
PR0220104
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2018 12:01:27 PM
Creation date
9/12/2018 4:04:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0220104
PE
2229
FACILITY_ID
FA0000649
FACILITY_NAME
FORMER NESTLE USA INC FACILITY
STREET_NUMBER
230
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
25938001
CURRENT_STATUS
02
SITE_LOCATION
230 INDUSTRIAL DR
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Yes No Comment <br />Contingency Plan and Emergency Procedures (cont.) <br />Chapter 15, Article 4 <br />Does the plan list all emergency equipment <br />including the location, physical description, and <br />outline of capabilities? [66265.52(e)] <br />Does the plan include an evacuation plan with <br />signals to begin evacuation, evacuation routes <br />and alternate routes? [66265.52(f)] <br />Is a copy of the plan, and all revisions to the <br />plan: [66265.53-] <br />(a) Maintained at the facility? <br />(b) Submitted to all entities with designated <br />response rolls? <br />Has the plan been reviewed and immediately <br />amended, if needed, whenever: [66265.54-] <br />(a) Applicable regulations are revised? _ <br />(b) The plan fails in an emergency? _ <br />(c) Facility changes require it? _ <br />(d) The list of emergency coordinators changes? <br />(e) The list of emergency equipment changes? <br />Is there at all times at least one employee at the <br />generator's facility, or close by and on call, <br />designated as EC, who is thoroughly familiar with <br />all facility operations, wastes, records, layout, <br />and emergency procedures, who has authority to <br />commit the resources to carry out the contingency <br />plan? [66265.55] <br />Revised 7/15/91 Page 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.