My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
2300 - Underground Storage Tank Program
>
PR0231482
>
COMPLIANCE INFO 1994-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 4:57:02 PM
Creation date
9/12/2018 4:47:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1994-2010
FileName_PostFix
1994-2010
RECORD_ID
PR0231482
PE
2361
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jan 23 06 08:16p MIe Dotten 20533-2650 p.3 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />N Other (Specify) [neon <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon STS <br />Equipment Resolution: 0.0001" <br />* ;, <br />UDC # 1 UDC '# 2 <br />UDC # 3 <br />UDC # <br />UDC Manufacturer: <br />Unknown Unknown <br />Unknown <br />UDC Material: <br />FRP FRP <br />FRP <br />UDC Depth: <br />30" 30" <br />30" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />0 0 <br />0 <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />12" 12" <br />12" <br />Condition of UDC prior to <br />testing: <br />Good Good <br />Good <br />Portion of UDC Tested <br />Above electrical Above electrical <br />Above electrical <br />Does turbine shut down when <br />UDC sensor detectsliquid (both <br />product and water)? <br />N Yes ❑ No❑ NA N Yes❑ No❑NA <br />®Yes❑ No❑ NA <br />❑Yes❑ No❑ NA <br />Turbine shutdown response time <br />Yes No NA Yes No NA <br />Yes No® NA <br />Yes No NA <br />Is system programmed for fail- <br />safe shutdown? <br />❑ Yes N No[] NA ❑ Yes® No❑NA <br />❑YesN No❑ NA <br />❑Yes❑ No❑ NA <br />Was fail-safe verified to be <br />o erational?• <br />❑ Yes ❑ NoN NA ❑ Yes❑ NoNNA <br />❑Yes❑ NaN NA <br />❑Yes❑ No❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />None None <br />None <br />Test Start Time: <br />12:33 12:16 <br />12:33 <br />Initial Reading I): <br />4.7628 5.6475 <br />4.5961 <br />Test End Time: <br />12:49 12:31 <br />12:48 <br />Final Reading (RF): <br />4.7639 5.6485 <br />4.5957 <br />Test Duration: <br />15 min 15 min <br />15min <br />Change in Reading -RI): <br />0.0011 0.001 <br />0.0004 <br />Pass/Fail Threshold or Criteria: <br />0.002 0.002 <br />0.002 <br />Test Result: <br />N Pass ❑ Fail N Pass ❑ Fail <br />N Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testin ? <br />Yes No NA Yes No NA <br />Yes No NA <br />Yes No NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />N Yes ❑ No❑ NA N Yes❑ No❑NA <br />NYes❑ No❑ NA <br />❑Yes❑ No❑ NA <br />Comments — rnelude information on repairs made prior to testing, and recommendedfo(low-np jor failed tests) <br />The UDCs took a few tests to all pass. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (") is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.