Laserfiche WebLink
Jan 23 06 08:17p MIe Dotten 200533-2650 p.4 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer Industry Standard Professional Engineer <br />® Other (Specify) lncon <br />Test Method Used: ❑ Pressure ❑ vacuum ® Hydrostatic <br />❑ Other (Spew) <br />Test Equipment Used: Incon STS Equipment Resolution: 0.0001" <br />,Spilt <br />DFl <br />Spill Box #REG <br />Spill Box # DF2 <br />Box #. <br />Bucket Diameter: <br />12" <br />12" <br />12" <br />Bucket Depth: <br />10 <br />10 <br />10 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />None <br />None <br />None <br />Test Start Time: <br />14:34 <br />14:34 <br />13:04 <br />Initial Reading W: <br />1.8779 <br />1.7882 <br />2.4192 <br />Test End Time: <br />14:49 <br />14:49 <br />13:19 <br />Final Reading (RP): <br />1.8768 <br />1.7876 <br />2.4196 <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />Change in Reading (Rr-R,): <br />0.0011 <br />0.0006 <br />0.0004 <br />Pass/Fail Threshold or <br />Criteria: <br />0.002 <br />0.002 <br />0.002 <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-up for failed tests) <br />DF3 would not pass until we retightened the fillcap adapter. The start time was wrong for DFI and Reg. We had not <br />set the system clock until after the test. <br />