Laserfiche WebLink
0 <br />INTRODUCTION <br />0 <br />Page 3 <br />SEMCO has adopted the following health & Safety Plan and procedures for the excavation <br />and\or closure of underground petroleum storage tanks and associated activities. The <br />purpose of this plan is to provide health and safety guidelines to be adhered to while all <br />work is in progress. <br />All personnel involved with the tank removal or associated activities will have an assigned <br />responsibility. The outlined responsibilities will establish standards for personnel protective <br />wear and safety procedures, and will provide for emergency actions which could arise <br />during project operations. <br />