Laserfiche WebLink
0 <br />SCOPE OF WOM <br />0 <br />Page 4 <br />1.0 Scope of Work: The scope of work consists of the removal and disposal of one (1) <br />10,000 gallon and one (1) 6,000 gallon underground diesel storage tanks. <br />Tank will be purged of all remaining residues, and these residues will be stored on <br />site in 55 gallon D.O.T. approved drums until they are hauled away for disposal by <br />a certified hazardous materials hauler. <br />The tank will be inerted with a minimum of 30 lbs. of dry ice per 1,000 gallons of <br />tank capacity. More ice will be added if necessary to displace the oxygen in the <br />tank to a concentration level below the OSHA approved lower explosive limit. <br />When this level is obtained the tank will be removed and samples will be collected <br />per the approved work plan. <br />1.1 Responsibilities of Other Agencies Present: <br />a. The Environmental Health Department is responsible for approval and <br />inspection of procedures, including excavation, sample procurement and integrity <br />of work plan. <br />b. The Fire Department is responsible for inspection relative to safe procedures <br />and condition of tank prior to removal. <br />