My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
320
>
2300 - Underground Storage Tank Program
>
PR0231481
>
REMOVAL 1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 5:10:15 PM
Creation date
9/12/2018 5:00:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1994
FileName_PostFix
1994
RECORD_ID
PR0231481
PE
2381
FACILITY_ID
FA0003931
FACILITY_NAME
RIPON MILLING CO
STREET_NUMBER
320
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25929015
CURRENT_STATUS
02
SITE_LOCATION
320 S STOCKTON AVE
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />SCOPE OF WOM <br />0 <br />Page 4 <br />1.0 Scope of Work: The scope of work consists of the removal and disposal of one (1) <br />10,000 gallon and one (1) 6,000 gallon underground diesel storage tanks. <br />Tank will be purged of all remaining residues, and these residues will be stored on <br />site in 55 gallon D.O.T. approved drums until they are hauled away for disposal by <br />a certified hazardous materials hauler. <br />The tank will be inerted with a minimum of 30 lbs. of dry ice per 1,000 gallons of <br />tank capacity. More ice will be added if necessary to displace the oxygen in the <br />tank to a concentration level below the OSHA approved lower explosive limit. <br />When this level is obtained the tank will be removed and samples will be collected <br />per the approved work plan. <br />1.1 Responsibilities of Other Agencies Present: <br />a. The Environmental Health Department is responsible for approval and <br />inspection of procedures, including excavation, sample procurement and integrity <br />of work plan. <br />b. The Fire Department is responsible for inspection relative to safe procedures <br />and condition of tank prior to removal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.