My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
411
>
2300 - Underground Storage Tank Program
>
PR0503206
>
REMOVAL 1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2018 8:15:36 AM
Creation date
9/12/2018 5:10:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1992
FileName_PostFix
1992
RECORD_ID
PR0503206
PE
2381
FACILITY_ID
FA0005719
FACILITY_NAME
S & L CONSTRUCTION
STREET_NUMBER
411
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
AVE
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
411 S STOCKTON AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� �� <br />�� �� <br />� �� <br />Page 3 <br />JNTRODUCTION <br />SEMCO has adopted the following Health & Safety Plan and <br />procedures for the removal and/or closure of underground <br />petroleum storage tanks and associated piping. The <br />purpose of this plan is to provide health and safety <br />guidelines to be adhered to while all work is in <br />progress. <br />All personnel involved with the tank removal or <br />associated activities will have an assigned <br />responsibility. The outlined responsibilities will <br />establish standards for personnel protective wear and <br />safety procedures, and will provide for emergency <br />actions which could arise during project operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.