Laserfiche WebLink
SAN 10AQU I N <br />COUNTY <br />Environmental Health Department <br />qW.. Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: _7Facility <br />RIPON FUEL FACILITY <br />Phone: <br />(209) 599-2108 <br />Date: <br />July 19, 2018 <br />Facility Address: <br />240 Doak Blvd, RIPON, CA 95366 <br />CERS ID: <br />1 10187143 <br />Inspection Contact: <br />Ted Johnston <br />Title: <br />Public Works Director <br />Phone: <br />1 (2 09) 599-2108 <br />Inspection Type: <br />ROUTINE INSPECTION - Operating Permit <br />Program: <br />12832-ASTFAC 10 K- </=100 K GAL CUMULATIVE <br />Consent For: Consent Given By: <br />N Ins ection ❑ Photos ❑ Sam les I Don Meeuwse, Foreman <br />CCR = California Code of Regulations HSC = Health and Safety Code CFR = Code of Federal Regulations <br />V = Violation R = Repeat violation COS - Corrected on site during inspection <br />Aboveground Petroleum Storage Act <br />101 <br />HSC 25270.6(b) <br />Failed to pay APSA program annual fees <br />❑ V o R o COS <br />102 <br />HSC 25270.4.5(a) <br />Failed to prepare a written SPCC Plan in accordance with CFR Part 112 <br />■ V o R o COS <br />103 <br />HSC 25270.6(a) <br />Failed to file HMBP or annual facility tank statement <br />o V o R o COS <br />104 <br />HSC 25270.8 <br />Failed to report spills or releases of 42 gallons (one barrel) or more <br />o V o R c COS <br />105 <br />CFR 112.1(b)(3), 112.2 <br />Failure to properly close tanks when making a claim of permanently closed <br />o V o R c COS <br />106 <br />CCR 25185(c)(3) <br />Failed to submit a written response within 30 days of receiving an inspection report <br />o V c R c COS <br />107 <br />HSC 25270.2(a)(4) <br />Failure to prepare SPCC plan when facility no longer meets oil -filled electrical equipment exclusion <br />o V o R o COS <br />108 <br />HSC 25270.4.5(a) <br />Failure of conditionally exempt facility to conduct inspections or install secondary containment <br />o V o R n COS <br />Requirement to Prepare and Implement a SPCC Plan <br />201 <br />CFR 112.3(d) <br />Failure to have a licensed PE properly review and certify the SPCC plan <br />❑ V n R o COS <br />202 <br />CFR 112.3(e)(1) <br />Failed to maintain a copy of the Plan on site <br />c V o R c COS <br />203 <br />CFR 112.3 <br />Failure to implement the SPCC Plan <br />o V o R o COS <br />204 <br />CFR 112.3(g) <br />Failure to prepare SPCC Plan when facility no longer meets Qualified Facility criteria <br />c V o R o COS <br />205 <br />CFR 112.3, 112.6 <br />Failure to prepare SPCC Plan that meets all applicable requirements <br />c V o R o COS <br />206 <br />CFR 112.3(d)(1) <br />Failure of owner to assure that the PE makes all required attestations in the Plan <br />a V o R o COS <br />Amendment of SPCC Plan by Owners or Operators <br />301 <br />CFR 112.5(a) <br />Failed to amend Plan as necessary <br />o V c R c COS <br />302 <br />CFR 112.5(b) <br />Failed to review Plan once every five years and/or implement any resulting amendments <br />c V c R c COS <br />303 <br />CFR 112.5(c) <br />Failed to have a PE certify technical amendments <br />o V o R o COS <br />304 <br />CFR 112.5(a), 112.5(b) <br />Failure to implement SPCC plan amendments within 6 months <br />o V o R o COS <br />Qualified Facility - Tier 1 <br />401 <br />CFR 112.6(a), 112.6(b) <br />Tier I Qualified Facility Plan not certified by the owner or a PE <br />o V o R o COS <br />402 <br />CFR 112.6(a)(2) <br />Owner of Tier I Qualified Facility failed to self certify technical amendment <br />o V o R o COS <br />403 <br />CFR 112.6(a)(3)(i) <br />Plan failed to predict direction/rate of flow/total quantity of oil potentially discharged <br />❑ V c R o COS <br />404 <br />CFR 112.6(a)(3)(ii) <br />No 2CT for bulk containers, or mobile storage containers not located to prevent discharge <br />❑ V o R o COS <br />405 <br />CFR 112.6(a)(3)(iii) <br />Overfill prevention for containers not provided. not described in Plan or tested <br />c V c R c COS <br />Qualified Facility - Tier II <br />501 CFR 112.6(a)(1), Tier II Qualified Facility Plan not certified by the owner or a PE, as required c V o R o COS <br />112.6(b) <br />FA0019249 PR0528648 SCO01 07/19/2018 <br />EHD 28-01 Rev. 11/07/2017 Page 1 of 4 Aboveground Petroleum Storage Act OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />