My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DOAK
>
240
>
2800 - Aboveground Petroleum Storage Program
>
PR0528648
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:19:12 PM
Creation date
9/13/2018 3:04:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528648
PE
2832
FACILITY_ID
FA0019249
FACILITY_NAME
RIPON FUEL FACILITY
STREET_NUMBER
240
STREET_NAME
DOAK
STREET_TYPE
Blvd
City
RIPON
Zip
95366
APN
25933015
CURRENT_STATUS
01
SITE_LOCATION
240 Doak Blvd
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN WOUIN <br />COUNTY <br />Environmental Health Department <br />FA0019249 PRO528648 SC001 07/19/2018 <br />EHD 28-01 Rev. 11/07/2017 Page 2 of 4 Aboveground Petroleum Storage Act OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />RIPON FUEL FACILITY <br />Facility Address: <br />240 Doak Blvd, RIPON <br />Date: <br />July 19, 2018 <br />Qualified Facility - Tier II <br />502 <br />CFR 112.6(b)(2) <br />Tier II Qualified Facility Plan technical amendment not certified by the owner or a PE <br />❑ V <br />❑ R <br />❑ COS <br />503 <br />CFR 112.6(b)(3), <br />112.6(b)(4) <br />Failure to have a PE certify in writing alternative measures for a Tier II Qualified Facility <br />❑ V <br />❑ R <br />o COS <br />504 <br />CFR 112.6(b)(4)(i) <br />Failure of owner to assure that a PE makes all required attestations in a Tier II Plan <br />❑ V <br />❑ R <br />u COS <br />General Requirements for SPCC Plans <br />601 <br />CFR 112.7 <br />Failure of Plan to fulfill basic requirements including a cross-referencing section <br />❑ V <br />o R <br />o COS <br />602 <br />CFR 112.7(a)(2) <br />Plan failed to discuss equivalent environmental protection, if applicable <br />❑ V <br />o R <br />❑ COS <br />603 <br />CFR 112.7(a)(3) <br />Failed to adequately describe the physical layout of the facility in the Plan <br />:i V <br />❑ R <br />❑ COS <br />604 <br />CFR 112.7(a)(3)(i) <br />Plan failed to include oil type and storage capacity for each container <br />o V <br />❑ R <br />❑ COS <br />605 <br />CFR 112.7(a)(3)(ii) <br />Plan failed to adequately discuss discharge prevention measures, including routine handling <br />❑ V <br />❑ R <br />❑ COS <br />606 <br />CFR 112.7(a)(3)(iii) <br />Plan failed to adequately discuss facility drainage or drainage controls <br />❑ V <br />❑ R <br />❑ COS <br />607 <br />CFR 112.7(a)(3)(iv) <br />Plan failed to include countermeasures for discharge discovery, response and cleanup <br />o V <br />❑ R <br />❑ COS <br />608 <br />CFR 112.7(a)(3)(v) <br />Plan failed to address disposal methods for recovered materials <br />❑ V <br />❑ R <br />❑ COS <br />609 <br />CFR 112.7(a)(3vi), <br />112.7(a4) <br />Plan failed to adequately contain procedures for reporting a discharge <br />❑ V <br />❑ R <br />❑ COS <br />610 <br />CFR 112.7(a)(5) <br />Discharge procedures are not adequately addressed if the facility has no response plan <br />o V <br />o R <br />❑ COS <br />611 <br />CFR 112.7(b) <br />Plan failed to include a description of potential equipment failure or provide equivalence <br />❑ V <br />❑ R <br />❑ COS <br />612 <br />CFR 112.7(c) <br />Plan failed to include secondary containment, diversionary structures, or equip to prevent discharge <br />❑ V <br />❑ R <br />❑ COS <br />613 <br />CFR 112.7(c) <br />Failure to provide appropriate secondary containment, diversionary structures or equipment <br />❑ V <br />❑ R <br />❑ COS <br />614 <br />CFR 112.7(d) <br />PE certified Plan failed to explain impracticability of containment/diversionary structures <br />❑ V <br />❑ R <br />❑ COS <br />615 <br />CFR 112.7(d) <br />Failure to perform integrity and leak testing when claiming secondary containment impracticability <br />❑ V <br />o R <br />❑ COS <br />616 <br />CFR 112.7(d)(1) <br />Failure to prepare an oil spill contingency plan when claiming impracticability of structures <br />o V <br />❑ R <br />❑ COS <br />617 <br />CFR 112.7(d)(2) <br />No written commitment of manpower, equipment, and materials to control and remove oil discharge <br />❑ V <br />❑ R <br />❑ COS <br />618 <br />CFR 112.7(e), 112.8(c) <br />(6) <br />Failed to keep records of procedures, inspections, or integrity tests for three years <br />❑ V <br />❑ R <br />❑ COS <br />619 <br />CFR 112.70(1) <br />Failed to train personnel on all discharge prevention details listed in this section <br />❑ V <br />❑ R <br />❑ COS <br />620 <br />CFR 112.7(f)(2) <br />Failed to designate a person accountable for discharge prevention <br />❑ V <br />❑ R <br />❑ COS <br />621 <br />CFR 112.7(f)(1) <br />Failure to include in the SPCC Plan an adequate description of employee training <br />❑ V <br />❑ R <br />❑ COS <br />622 <br />CFR 112.7(f)(3) <br />Failure to conduct complete annual discharge prevention briefings for oil -handling personnel <br />o V <br />o R <br />❑ COS <br />623 <br />CFR 112.7(g) <br />Plan failed to address security of site and valves, lock out/tag out, and lighting <br />o V <br />o R <br />o COS <br />624 <br />CFR 112.7(g) <br />Facility failed to implement security of site and valves, lock out/tag out, and lighting <br />❑ V <br />❑ R <br />❑ COS <br />625 <br />CFR 112.7(h) <br />Plan failed to adequately discuss facility tank car and tank truck loading/unloading rack <br />❑ V <br />❑ R <br />❑ COS <br />626 <br />CFR 112.7(h)(1) <br />Loading/unloading rack containment system not adequate to contain spill <br />❑ V <br />❑ R <br />❑ COS <br />627 <br />CFR 112.7(h)(2) <br />Failed to provide vehicular departure system for loading and unloading racks <br />❑ V <br />❑ R <br />o COS <br />628 <br />CFR 112.7(a)(1), <br />112.7 (j) <br />Failure to include in the Plan discussion of conformance with Federal and State requirements <br />❑ V <br />o R <br />❑ COS <br />629 <br />CFR 112.7(i) <br />Failed to evaluate field constructed container for brittle fracture and take appropriate action <br />❑ V <br />❑ R <br />❑ COS <br />FA0019249 PRO528648 SC001 07/19/2018 <br />EHD 28-01 Rev. 11/07/2017 Page 2 of 4 Aboveground Petroleum Storage Act OIR <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.