My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2800 - Aboveground Petroleum Storage Program
>
PR0527887
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 2:03:48 PM
Creation date
9/14/2018 1:15:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527887
PE
2831
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAILING ADDRESS <br /> RECEIVED <br /> P.O.Box 513396 <br /> Los Angeles,CA 90051-1396 <br /> JAN 0 4 2011 5200 Sheila Street <br /> Commerce,CA 90040 <br /> TEL 323.264.5200 <br /> U n if i ed ENVIRONMENTAL HEALTH www.unifiedgrocers.com <br /> GJ`oc'e, . PERMIT/SERVICES <br /> VIA Next Day Air <br /> Ms Thuy Tran 3 January 2011 <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton, CA 95202-3029 <br /> Re: Unified Grocers, Inc.; Response to Inspection and Corrective Action Statement. <br /> This letter is submitted in response to the Aboveground Petroleum Storage Act Program Inspection <br /> Report issued on 1 December 2010 to Unified Grocers, Inc. ("Unified Grocers") located at 1990 Piccoli <br /> Road in Stockton (the "site"). A copy of the inspection report is included in Attachment 1 for reference <br /> purposes. <br /> Item 8 directs Unified Grocers to amend the Spill Prevention, Countermeasure, and Control (SPCC) plan <br /> within 6 months of applicable changes to the facility. Unified Grocers is working diligently with JECSI to <br /> update the SPCC plan and is expected to be completed and certified by a Professional Engineer(PE) by <br /> 31 January 2011. The updated SPCC plan will include information about containers and devices that are <br /> currently present at the site and subject to SPCC requirements. <br /> Item 10 directs Unified Grocers to review and evaluate the SPCC plan once every 5 years. <br /> Documentation of the review and evaluation will be included in the SPCC plan. The updated SPCC plan <br /> is expected to be completed and certified by a PE by 31 January 2011. <br /> Item 11 directs Unified Grocers to have a PE certify technical amendments in the SPCC plan. The <br /> updated SPCC plan will include technical amendments and will be certified by a California Registered <br /> Professional Engineer. The updated plan is expected to be completed and certified by a PE by 31 <br /> January 2011. <br /> Item 18 directs Unified Grocers to ensure that the facility plan included in the SPCC identifies locations <br /> and contents of each petroleum container and connecting pipes. The updated SPCC plan will include the <br /> locations and contents of each petroleum container and connecting pipes subject to SPCC requirements. <br /> The updated plan is expected to be completed and certified by a PE by 31 January 2011. <br /> Item 19 directs Unified Grocers to include description of products types and storage capacity of each <br /> container subject to SPCC requirements. A site visit by a JECSI representative was conducted 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.