Laserfiche WebLink
San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />Aboveground Petroleum Storage Act Inspection Report <br />Facility Name: <br />NUCAL TRANSPORT SERVICES <br />Facility Address: <br />720 S STOCKTON AVE. RIPON <br />Date: <br />March 04. 2016 <br />General Requirements for SPCC Plans <br />614 <br />CFR 112.71f)i i'i <br />Failed to train personnel on discharge prevention <br />Failed to designate a person accountable for discharge prevention <br />■ V ❑ R COS <br />615 <br />CFR 112.7(f)(2) <br />o V o R ❑ COS <br />616 <br />CFR 112.7(f)(3) <br />Failed to schedule and conduct discharge prevention briefings at least annually <br />o V o R ❑ COS <br />617 <br />CFR 112,7(g) <br />Plan failed to address security of site and valves. lock ouUtag out, and lighting <br />o V o R o COS <br />618 <br />CFR 112.7(h)(1) <br />Loading/unloading rack containment system not properly sized <br />o V o R c COS <br />V _ R e COS <br />o V ❑ R COS <br />c V o R :-. COS <br />619 <br />620 <br />CFR 112.7(h)(2) <br />Failed to provide vehicular departure system loading and unloading racks <br />CFR 112.7(h)(3) <br />Failed to inspect lowermost drains and outlets prior to filling and departure of vehicles <br />621 <br />CFR 112.7(i) <br />Failed to evaluate field constructed container for brittle fracture and take appropriate action <br />622 <br />CFR 112.7(j) <br />Failed to include discussion of conformance to discharge prevention and containment procedures <br />V r, R COS <br />SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br />701 <br />CFR 112.8(b)(2) <br />Failed to use manual open -and -closed design valves for the drainage of diked areas <br />V r R COS <br />702 <br />CFR 112.8(b)(3). <br />112.8(b)(4) <br />Failed to design facility drainage system from undiked areas to retain in the facility <br />n V e R - COS <br />o V _ R n COS <br />703 <br />CFR 112.8(b)(5) <br />Failed to provide two lift pumps for more than one continuous treatment unit <br />704 <br />CFR 112.8(,)(2) <br />Diked area is not sufficiently impervious to contain discharged oil <br />❑ V - R o COS <br />705 <br />CFR 11 2.8(c)(1) <br />Container not compatible with oil stored and/or storage conditions <br />V ; R COS <br />706 <br />CFR 11 2.8(c)(2) <br />Failed to provide and maintain adequate secondary containment <br />o V r R COS <br />707 <br />CFR 112.8(c)(3)(i) <br />Faded to keep containment bypass valves closed when not draining rainwater <br />in V F R ❑ COS <br />708 <br />CFR 112.8(c)(3)(ii) <br />Faded to inspect retained rainwater prior to discharge <br />o V c R ❑ COS <br />709 <br />CFR 112 8(c)(3)(iii) <br />Failed to open and close bypass valve to drain rainwater under responsible supervision <br />❑ V - R - COS <br />710 <br />CFR 112.8(c)(3)(iv) <br />Failed to maintain records of drainage from diked areas <br />o V ❑ R _ COS <br />711 <br />CFR 112 8(c)(5) <br />Failed to provide corrosion protection for partially buried tanks <br />❑ V ❑ R ❑ COS <br />712 <br />CFR 11 2.8(,)(6) <br />Failed to perform tank inspections that take into account size, configuration, and design <br />n V R COS <br />713 <br />CFR 11 2.8(c)(6) <br />Failed to perform scheduled tank tests and inspections by appropriately qualified personnel <br />o V R COS <br />714 <br />CFR 112.8(,)(6) <br />Failed to test and inspect containers by appropriately qualified personnel after material repairs <br />❑ V R COS <br />715 <br />CFR 11 2.8(c)(7) <br />Failed to provide effective leakage control through defective internal heating coils <br />o V _ R COS <br />716 <br />CFR 112.8(c)(8)(i-iv) <br />Failed to provide each container with a high level monitoring device <br />o V o R c COS <br />c V - R e COS <br />717 <br />CFR 112.8(c)(8)(v) <br />Failed to regularly test liquid level sensing devices to ensure proper operation <br />718 <br />CFR 11 2.8(c)(9) <br />Failed to observe effluent treatment frequently enough to detect potential discharge <br />o V Ei R a COS <br />719 <br />CFR 112 8(c)(10) <br />Faded to promptly correct visible discharges and/or remove accumulations of oil in diked areas <br />■ V ❑ R ❑ COS <br />720 <br />CFR 112.8(,)(11) <br />Failed to provide sufficient secondary containment capacity for mobile or portable containers <br />r V =- R COS <br />721 <br />CFR 112.8(,)(11) <br />Failed to locate mobile or portable containers to prevent discharge <br />V _ R COS <br />722 <br />CFR 112.8(d)(1) <br />Failed to take corrective action on buried piping when exposed for any reason <br />V _: R - COS <br />723 <br />CFR 112.8(d)(1) <br />Faded to provide corrosion protection for buried piping <br />o V _ R COS <br />724 <br />CFR 112 8(d)(2) <br />Failed to cap/blank-flange connection at transfer point and mark its origin if not in service <br />- V R COS <br />Page 2 of 5 <br />